Skip to main content

Roofing

How to get licensed for Roofing in Florida

Each row links to the controlling §statute on our laws mirror.

License Categories§489.113
Examination§489.514
Experience Required§489.105
Insurance & Bonding§489.147
Fees§489.557
Continuing Education§489.517
Penalties for Unlicensed Work§489.127

Roofing laws & codes that apply in Florida

Florida Statutes (13 sections)
  • Fla. Stat. § 553.73 Florida Building Code. — Florida roofing contractor license

    553.73 Florida Building Code. — (1)(a) The commission shall adopt, by rule pursuant to ss. 120.536 (1) and 120.54 , the Florida Building Code which shall contain or incorporate by reference all laws and rules which pertain to and govern the design, construction, erection, alteration, modification, repair, and demolition of public and private buildings, structures, and facilities and enforcement of such laws and rules, except as otherwise provided in this section. (b) The technical portions of the Florida Accessibility Code for Building Construction shall be contained in their entirety in the Florida Building Code. The civil rights portions and the technical portions of the accessibility laws of this state shall remain as currently provided by law. Any revision or amendments to the Florida Accessibility Code for Building Construction pursuant to part II shall be considered adopted by the commission as part of the Florida Building Code. Neither the commission nor any local government shall revise or amend any standard of the Florida Accessibility Code for Building Construction except as provided for in part II. (c) The Florida Fire Prevention Code and the Life Safety Code shall be referenced in the Florida Building Code, but shall be adopted, modified, revised, or amended, interpreted, and maintained by the Department of Financial Services by rule adopted pursuant to ss. 120.536 (1) and 120.54 . The Florida Building Commission may not adopt a fire prevention or lifesafety code, and nothing in the Florida Building Code shall affect the statutory powers, duties, and responsibilities of any fire official or the Department of Financial Services. (d) Conflicting requirements between the Florida Building Code and the Florida Fire Prevention Code and Life Safety Code of the state established pursuant to ss. 633.206 and 633.208 shall be resolved by agreement between the commission and the State Fire Marshal in favor of the requirement that offers the greatest degree of lifesafety or alternatives that would provide an equivalent degree of lifesafety and an equivalent method of construction. If the commission and State Fire Marshal are unable to agree on a resolution, the question shall be referred to a mediator, mutually agreeable to both parties, to resolve the conflict in favor of the provision that offers the greatest lifesafety, or alternatives that would provide an equivalent degree of lifesafety and an equivalent method of construction. (e) Subject to the provisions of this act, responsibility for enforcement, interpretation, and regulation of the Florida Building Code shall be vested in a specified local board or agency, and the words “local government” and “local governing body” as used in this part shall be construed to refer exclusively to such local board or agency. (2) The Florida Building Code shall contain provisions or requirements for public and private buildings, structures, and facilities relative to structural, mechanical, electrical, plumbing, energy, and gas systems, existing buildings, historical buildings, manufactured buildings, elevators, coastal construction, lodging facilities, food sales and food service facilities, health care facilities, including assisted living facilities, adult day care facilities, hospice residential and inpatient facilities and units, and facilities for the control of radiation hazards, public or private educational facilities, swimming pools, and correctional facilities and enforcement of and compliance with such provisions or requirements. Further, the Florida Building Code must provide for uniform implementation of ss. 515.25 , 515.27 , and 515.29 by including standards and criteria for residential swimming pool barriers, pool covers, latching devices, door and window exit alarms, and other equipment required therein, which are consistent with the intent of s. 515.23 . Technical provisions to be contained within the Florida Building Code are restricted to requirements related to the types of materials used and construction methods and standards employed in order to meet criteria specified in the Florida Building Code. Provisions relating to the personnel, supervision or training of personnel, or any other professional qualification requirements relating to contractors or their workforce may not be included within the Florida Building Code, and subsections (4), (6), (7), (8), and (9) are not to be construed to allow the inclusion of such provisions within the Florida Building Code by amendment. This restriction applies to both initial development and amendment of the Florida Building Code. (3) The commission shall use the International Codes published by the International Code Council, the National Electric Code (NFPA 70), or other nationally adopted model codes and standards for updates to the Florida Building Code. The commission may approve technical amendments to the code as provided in subsections (8) and (9), subject to all of the following conditions: (a) The proposed amendment must have been published on the commission’s website for a minimum of 45 days and all the associated documentation must have been made available to any interested party before consideration by a technical advisory committee. (b) In order for a technical advisory committee to make a favorable recommendation to the commission, the proposal must receive a two-thirds vote of the members present at the meeting. At least half of the regular members must be present in order to conduct a meeting. (c) After the technical advisory committee has considered and recommended approval of any proposed amendment, the proposal must be published on the commission’s website for at least 45 days before consideration by the commission. (d) A proposal may be modified by the commission based on public testimony and evidence from a public hearing held in accordance with chapter 120. The commission shall incorporate within the Florida Building Code provisions that address regional and local concerns and variations. The commission shall make every effort to minimize conflicts between the Florida Building Code, the Florida Fire Prevention Code, and the Life Safety Code. (4)(a) All entities authorized to enforce the Florida Building Code under s. 553.80 shall comply with applicable standards for issuance of mandatory certificates of occupancy, minimum types of inspections, and procedures for plans review and inspections as established by the commission by rule. Local governments may adopt amendments to the administrative provisions of the Florida Building Code, subject to the limitations in this subsection. Local amendments must be more stringent than the minimum standards described in this section and must be transmitted to the commission within 30 days after enactment. The local government shall make such amendments available to the general public in a usable format. The State Fire Marshal is responsible for establishing the standards and procedures required in this subsection for governmental entities with respect to applying the Florida Fire Prevention Code and the Life Safety Code. (b) Local governments may, subject to the limitations in this section and not more than once every 6 months, adopt amendments to the technical provisions of the Florida Building Code that apply solely within the jurisdiction of such government and that provide for more stringent requirements than those specified in the Florida Building Code. A local government may adopt technical amendments that address local needs if: 1. The local governing body determines, following a public hearing which has been advertised in a newspaper of general circulation at least 10 days before the hearing, that there is a need to strengthen the requirements of the Florida Building Code. The determination must be based upon a review of local conditions by the local governing body, which review demonstrates by evidence or data that the geographical jurisdiction governed by the local governing body exhibits a local need to strengthen the Florida Building Code beyond the needs or regional variation addressed by the Florida Building Code, that the local need is addressed by the proposed local amendment, and that the amendment is no more stringent than necessary to address the local need. 2. Such additional requirements are not discriminatory against materials, products, or construction techniques of demonstrated capabilities. 3. Such additional requirements may not introduce a new subject not addressed in the Florida Building Code. (c) The enforcing agency shall make readily available, in a usable format, all amendments adopted under this section. (d) Any amendment to the Florida Building Code shall be transmitted within 30 days after adoption by the local government to the commission. The commission shall maintain copies of all such amendments in a format that is usable and obtainable by the public. Local technical amendments are not effective until 30 days after the amendment has been received and published by the commission. (e) An amendment to the Florida Building Code adopted by a local government under this subsection is effective only until the adoption of the new edition of the Florida Building Code by the commission every third year. At such time, the commission shall review such amendment for consistency with the criteria in paragraph (9)(a) and adopt such amendment as part of the Florida Building Code or rescind the amendment. The commission shall immediately notify the respective local government of the rescission of any amendment. After receiving such notice, the respective local government may readopt the rescinded amendment under the provisions of this subsection. (f) Each county and municipality desiring to make local technical amendments to the Florida Building Code shall establish by interlocal agreement a countywide compliance review board to review any amendment to the Florida Building Code that is adopted by a local government within the county under this subsection and that is challenged by a substantially affected party for purposes of determining the amendment’s compliance with this subsection. If challenged, the local technical amendments are not effective until the time for filing an appeal under paragraph (g) has expired or, if there is an appeal, until the commission issues its final order determining if the adopted amendment is in compliance with this subsection. (g) If the compliance review board determines such amendment is not in compliance with this subsection, the compliance review board shall notify such local government of the noncompliance and that the amendment is invalid and unenforceable until the local government corrects the amendment to bring it into compliance. The local government may appeal the decision of the compliance review board to the commission. If the compliance review board determines that such amendment is in compliance with this subsection, any substantially affected party may appeal such determination to the commission. Any such appeal must be filed with the commission within 14 days after the board’s written determination. The commission shall promptly refer the appeal to the Division of Administrative Hearings by electronic means through the division’s website for the assignment of an administrative law judge. The administrative law judge shall conduct the required hearing within 30 days after being assigned to the appeal, and shall enter a recommended order within 30 days after the conclusion of such hearing. The commission shall enter a final order within 30 days after an order is rendered. Chapter 120 and the uniform rules of procedure shall apply to such proceedings. The local government adopting the amendment that is subject to challenge has the burden of proving that the amendment complies with this subsection in proceedings before the compliance review board and the commission, as applicable. Actions of the commission are subject to judicial review under s. 120.68 . The compliance review board shall determine whether its decisions apply to a respective local jurisdiction or apply countywide. (h) An amendment adopted under this subsection must include a fiscal impact statement that documents the costs and benefits of the proposed amendment. Criteria for the fiscal impact statement shall include the impact to local government relative to enforcement and the impact to property and building owners and industry relative to the cost of compliance. The fiscal impact statement may not be used as a basis for challenging the amendment for compliance. (i) In addition to paragraphs (f) and (g), the commission may review any amendments adopted under this subsection and make nonbinding recommendations related to compliance of such amendments with this subsection. (j) Any amendment adopted by a local enforcing agency under this subsection may not apply to state or school district owned buildings, manufactured buildings or factory-built school buildings approved by the commission, or prototype buildings approved under s. 553.77 (3). The respective responsible entities shall consider the physical performance parameters substantiating such amendments when designing, specifying, and constructing such exempt buildings. (k) A technical amendment to the Florida Building Code related to water conservation practices or design criteria adopted by a local government under this subsection is not void when the code is updated if the technical amendment is necessary to protect or provide for more efficient use of water resources as provided in s. 373.621 . However, any such technical amendment carried forward into the next edition of the code under this paragraph is subject to review or modification as provided in this part. (l) If a local government adopts a regulation, law, ordinance, policy, amendment, or land use or zoning provision without using the process established in this subsection, and a substantially affected person considers such regulation, law, ordinance, policy, amendment, or land use or zoning provision to be a technical amendment to the Florida Building Code, then the substantially affected person may submit a petition to the commission for a nonbinding advisory opinion. If a substantially affected person submits a request in accordance with this paragraph, the commission shall issue a nonbinding advisory opinion stating whether or not the commission interprets the regulation, law, ordinance, policy, amendment, or land use or zoning provision as a technical amendment to the Florida Building Code. As used in this paragraph, the term “local government” means a county, municipality, special district, or political subdivision of the state. 1. Requests to review a local government regulation, law, ordinance, policy, amendment, or land use or zoning provision may be initiated by any substantially affected person. A substantially affected person includes an owner or builder subject to the regulation, law, ordinance, policy, amendment, or land use or zoning provision, or an association of owners or builders having members who are subject to the regulation, law, ordinance, policy, amendment, or land use or zoning provision. 2. In order to initiate a review, a substantially affected person must file a petition with the commission. The commission shall adopt a form for the petition and directions for filing, which shall be published on the Building Code Information System. The form shall, at a minimum, require the following: a. The name of the local government that enacted the regulation, law, ordinance, policy, amendment, or land use or zoning provision. b. The name and address of the local government’s general counsel or administrator. c. The name, address, and telephone number of the petitioner; the name, address, and telephone number of the petitioner’s representative, if any; and an explanation of how the petitioner’s substantial interests are being affected by the regulation, law, ordinance, policy, amendment, or land use or zoning provision. d. A statement explaining why the regulation, law, ordinance, policy, amendment, or land use or zoning provision is a technical amendment to the Florida Building Code, and which provisions of the Florida Building Code, if any, are being amended by the regulation, law, ordinance, policy, amendment, or land use or zoning provision. 3. The petitioner shall serve the petition on the local government’s general counsel or administrator by certified mail, return receipt requested, and send a copy of the petition to the commission, in accordance with the commission’s published directions. The local government shall respond to the petition in accordance with the form by certified mail, return receipt requested, and send a copy of its response to the commission, within 14 days after receipt of the petition, including Saturdays, Sundays, and legal holidays. 4. Upon receipt of a petition that meets the requirements of this paragraph, the commission shall publish the petition, including any response submitted by the local government, on the Building Code Information System in a manner that allows interested persons to address the issues by posting comments. 5. Before issuing an advisory opinion, the commission shall consider the petition, the response, and any comments posted on the Building Code Information System. The commission may also provide the petition, the response, and any comments posted on the Building Code Information System to a technical advisory committee, and may consider any recommendation provided by the technical advisory committee. The commission shall issue an advisory opinion stating whether the regulation, law, ordinance, policy, amendment, or land use or zoning provision is a technical amendment to the Florida Building Code within 30 days after the filing of the petition, including Saturdays, Sundays, and legal holidays. The commission shall publish its advisory opinion on the Building Code Information System and in the Florida Administrative Register. The commission’s advisory opinion is nonbinding and is not a declaratory statement under s. 120.565 . (5) Notwithstanding subsection (4), counties and municipalities may adopt by ordinance an administrative or technical amendment to the Florida Building Code relating to flood resistance in order to implement the National Flood Insurance Program or incentives. Specifically, an administrative amendment may assign the duty to enforce all or portions of flood-related code provisions to the appropriate agencies of the local government and adopt procedures for variances and exceptions from flood-related code provisions other than provisions for structures seaward of the coastal construction control line consistent with the requirements in 44 C.F.R. s. 60.6. A technical amendment is authorized to the extent it is more stringent than the code. A technical amendment is not subject to the requirements of subsection (4) and may not be rendered void when the code is updated if the amendment is adopted for the purpose of participating in the Community Rating System promulgated pursuant to 42 U.S.C. s. 4022, the amendment had already been adopted by local ordinance prior to July 1, 2010, or the amendment requires a design flood elevation above the base flood elevation. Any amendment adopted under this subsection shall be transmitted to the commission within 30 days after being adopted. A municipality, county, or special district may not use preliminary maps issued by the Federal Emergency Management Agency for any law, ordinance, rule, or other measure that has the effect of imposing land use changes or permits. (6) The initial adoption of, and any subsequent update or amendment to, the Florida Building Code by the commission is deemed adopted for use statewide without adoptions by local government. For a building permit for which an application is submitted prior to the effective date of the Florida Building Code, the state minimum building code in effect in the permitting jurisdiction on the date of the application governs the permitted work for the life of the permit and any extension granted to the permit. (7)(a) The commission shall adopt an updated Florida Building Code every 3 years through review of the most current updates of the International Building Code, the International Fuel Gas Code, the International Existing Building Code, the International Mechanical Code, the International Plumbing Code, and the International Residential Code, all of which are copyrighted and published by the International Code Council, and the National Electrical Code, which is copyrighted and published by the National Fire Protection Association. At a minimum, the commission shall adopt any updates to such codes or any other code necessary to maintain eligibility for federal funding and discounts from the National Flood Insurance Program, the Federal Emergency Management Agency, and the United States Department of Housing and Urban Development. The commission shall also review and adopt updates based on the International Energy Conservation Code (IECC); however, the commission shall maintain the efficiencies of the Florida Energy Efficiency Code for Building Construction adopted and amended pursuant to s. 553.901 . Every 3 years, the commission may approve updates to the Florida Building Code without a finding that the updates are needed in order to accommodate the specific needs of this state. The commission shall adopt updated codes by rule. (b) Codes regarding noise contour lines shall be reviewed annually, and the most current federal guidelines shall be adopted. (c) The commission may also adopt as a technical amendment to the Florida Building Code any portion of the codes identified in paragraph (a), but only as needed to accommodate the specific needs of this state. Standards or criteria adopted from these codes shall be incorporated by reference to the specific provisions adopted. If a referenced standard or criterion requires amplification or modification to be appropriate for use in this state, only the amplification or modification shall be set forth in the Florida Building Code. The commission may approve technical amendments to the updated Florida Building Code after the amendments have been subject to the conditions set forth in paragraphs (3)(a)-(d). Amendments that are adopted in accordance with this subsection shall be clearly marked in printed versions of the Florida Building Code so that the fact that the provisions are amendments is readily apparent. (d) The commission shall further consider the commission’s own interpretations, declaratory statements, appellate decisions, and approved statewide and local technical amendments and shall incorporate such interpretations, statements, decisions, and amendments into the updated Florida Building Code only to the extent that they are needed to accommodate the specific needs of the state. A change made by an institute or standards organization to any standard or criterion that is adopted by reference in the Florida Building Code does not become effective statewide until it has been adopted by the commission. Furthermore, the edition of the Florida Building Code which is in effect on the date of application for any permit authorized by the code governs the permitted work for the life of the permit and any extension granted to the permit. (e) A rule updating the Florida Building Code in accordance with this subsection shall take effect no sooner than 6 months after publication of the updated code. Any amendment to the Florida Building Code which is adopted upon a finding by the commission that the amendment is necessary to protect the public from immediate threat of harm takes effect immediately. If energy code compliance software is not approved by the commission at least 3 months before the effective date of the updated Florida Building Code, the commission may delay the effective date of the energy provisions of the Florida Building Code for up to 3 additional months. (f) Provisions of the Florida Building Code, including those contained in referenced standards and criteria, relating to wind resistance or the prevention of water intrusion may not be modified to diminish those construction requirements; however, the commission may, subject to conditions in this subsection, modify the provisions to enhance those construction requirements. (g) The commission shall modify the Florida Building Code to state that sealed drawings by a design professional are not required for the replacement of windows, doors, or garage doors in an existing one-family or two-family dwelling or townhouse if all of the following conditions are met: 1. The replacement windows, doors, or garage doors are installed in accordance with the manufacturer’s instructions for the appropriate wind zone. 2. The replacement windows, doors, or garage doors meet the design pressure requirements in the most recent version of the Florida Building Code, Residential. 3. A copy of the manufacturer’s instructions is submitted with the permit application in a printed or digital format. 4. The replacement windows, doors, or garage doors are the same size and are installed in the same opening as the existing windows, doors, or garage doors. (8) Notwithstanding subsection (3) or subsection (7), the commission may address issues identified in this subsection by amending the code under the rule adoption procedures in chapter 120. Updates to the Florida Building Code, including provisions contained in referenced standards and criteria which relate to wind resistance or the prevention of water intrusion, may not be amended under this subsection to diminish those standards; however, the commission may amend the Florida Building Code to enhance such standards. Following the approval of any amendments to the Florida Building Code by the commission and publication of the amendments on the commission’s website, authorities having jurisdiction to enforce the Florida Building Code may enforce the amendments. (a) The commission may approve amendments that are needed to address: 1. Conflicts within the updated code; 2. Conflicts between the updated code and the Florida Fire Prevention Code adopted under chapter 633; 3. Unintended results from the integration of previously adopted amendments with the model code; 4. Equivalency of standards; 5. Changes to or inconsistencies with federal or state law; or 6. Adoption of an updated edition of the National Electrical Code if the commission finds that delay of implementing the updated edition causes undue hardship to stakeholders or otherwise threatens the public health, safety, and welfare. (b) The commission may issue errata to the code pursuant to the rule adoption procedures in chapter 120 to list demonstrated errors in provisions contained within the Florida Building Code. The determination of such errors and the issuance of errata to the code must be approved by a 75-percent supermajority vote of the commission. For purposes of this paragraph, “errata to the code” means a list of errors on current and previous editions of the Florida Building Code. (9)(a) The commission may approve technical amendments to the Florida Building Code once each year for statewide or regional application upon a finding that the amendment: 1. Is needed in order to accommodate the specific needs of this state. 2. Has a reasonable and substantial connection with the health, safety, and welfare of the general public. 3. Strengthens or improves the Florida Building Code, or in the case of innovation or new technology, will provide equivalent or better products or methods or systems of construction. 4. Does not discriminate against materials, products, methods, or systems of construction of demonstrated capabilities. 5. Does not degrade the effectiveness of the Florida Building Code. The Florida Building Commission may approve technical amendments to the code once each year to incorporate into the Florida Building Code its own interpretations of the code which are embodied in its opinions, final orders, declaratory statements, and interpretations of hearing officer panels under s. 553.775 (3)(c), but only to the extent that the incorporation of interpretations is needed to modify the code to accommodate the specific needs of this state. Amendments approved under this paragraph shall be adopted by rule after the amendments have been subjected to subsection (3). (b) A proposed amendment must include a fiscal impact statement that documents the costs and benefits of the proposed amendment. Criteria for the fiscal impact statement shall be established by rule by the commission and shall include the impact to local government relative to enforcement, the impact to property and building owners, and the impact to industry, relative to the cost of compliance. The amendment must demonstrate by evidence or data that the state’s geographical jurisdiction exhibits a need to strengthen the code beyond the needs or regional variations addressed by the code and why the proposed amendment applies to this state. (c) The commission may not approve any proposed amendment that does not accurately and completely address all requirements for amendment which are set forth in this section. The commission shall require all proposed amendments and information submitted with proposed amendments to be reviewed by commission staff prior to consideration by any technical advisory committee. These reviews shall be for sufficiency only and are not intended to be qualitative in nature. Staff members shall reject any proposed amendment that fails to include a fiscal impact statement. Proposed amendments rejected by members of the staff may not be considered by the commission or any technical advisory committee. (d) Provisions of the Florida Building Code, including those contained in referenced standards and criteria, relating to wind resistance or the prevention of water intrusion may not be amended pursuant to this subsection to diminish those construction requirements; however, the commission may, subject to conditions in this subsection, amend the provisions to enhance those construction requirements. (10) The following buildings, structures, and facilities are exempt from the Florida Building Code as provided by law, and any further exemptions shall be as determined by the Legislature and provided by law: (a) Buildings and structures specifically regulated and preempted by the Federal Government. (b) Railroads and ancillary facilities associated with the railroad. (c) Nonresidential farm buildings on farms. (d) Temporary buildings or sheds used exclusively for construction purposes. (e) Mobile or modular structures used as temporary offices, except that the provisions of part II relating to accessibility by persons with disabilities apply to such mobile or modular structures. (f) Those structures or facilities of electric utilities, as defined in s. 366.02 , which are directly involved in the generation, transmission, or distribution of electricity. (g) Temporary sets, assemblies, or structures used in commercial motion picture or television production, or any sound-recording equipment used in such production, on or off the premises. (h) Storage sheds that are not designed for human habitation and that have a floor area of 720 square feet or less are not required to comply with the mandatory wind-borne-debris-impact standards of the Florida Building Code. In addition, such buildings that are 400 square feet or less and that are intended for use in conjunction with one- and two-family residences are not subject to the door height and width requirements of the Florida Building Code. (i) Chickees constructed by the Miccosukee Tribe of Indians of Florida or the Seminole Tribe of Florida. As used in this paragraph, the term “chickee” means an open-sided wooden hut that has a thatched roof of palm or palmetto or other traditional materials, and that does not incorporate any electrical, plumbing, or other nonwood features. (j) Family mausoleums not exceeding 250 square feet in area which are prefabricated and assembled on site or preassembled and delivered on site and have walls, roofs, and a floor constructed of granite, marble, or reinforced concrete. (k) A building or structure having less than 1,000 square feet which is constructed and owned by a natural person for hunting and which is repaired or reconstructed to the same dimension and condition as existed on January 1, 2011, if the building or structure: 1. Is not rented or leased or used as a principal residence; 2. Is not located within the 100-year floodplain according to the Federal Emergency Management Agency’s current Flood Insurance Rate Map; and 3. Is not connected to an offsite electric power or water supply. (l) A drone port as defined in s. 330.41 (2). With the exception of paragraphs (a), (b), (c), and (f), in order to preserve the health, safety, and welfare of the public, the Florida Building Commission may, by rule adopted pursuant to chapter 120, provide for exceptions to the broad categories of buildings exempted in this section, including exceptions for application of specific sections of the code or standards adopted therein. The Department of Agriculture and Consumer Services shall have exclusive authority to adopt by rule, pursuant to chapter 120, exceptions to nonresidential farm buildings exempted in paragraph (c) when reasonably necessary to preserve public health, safety, and welfare. The exceptions must be based upon specific criteria, such as under-roof floor area, aggregate electrical service capacity, HVAC system capacity, or other building requirements. Further, the commission may recommend to the Legislature additional categories of buildings, structures, or facilities which should be exempted from the Florida Building Code, to be provided by law. The Florida Building Code does not apply to temporary housing provided by the Department of Corrections to any prisoner in the state correctional system. (11)(a) In the event of a conflict between the Florida Building Code and the Florida Fire Prevention Code and the Life Safety Code as applied to a specific project, the conflict shall be resolved by agreement between the local building code enforcement official and the local fire code enforcement official in favor of the requirement of the code which offers the greatest degree of lifesafety or alternatives which would provide an equivalent degree of lifesafety and an equivalent method of construction. Local boards created to address issues arising under the Florida Building Code or the Florida Fire Prevention Code may combine the appeals boards to create a single, local board having jurisdiction over matters arising under either code or both codes. The combined local appeals board may grant alternatives or modifications through procedures outlined in NFPA 1, Section 1.4, but may not waive the requirements of the Florida Fire Prevention Code. To meet the quorum requirement for convening the combined local appeals board, at least one member of the board who is a fire protection contractor, a fire protection design professional, a fire department operations professional, or a fire code enforcement professional must be present. (b) Any decision made by the local fire official regarding application, interpretation, or enforcement of the Florida Fire Prevention Code or by the local building official regarding application, interpretation, or enforcement of the Florida Building Code, or the appropriate application of either code or both codes in the case of a conflict between the codes, may be appealed to a local administrative board designated by the municipality, county, or special district having firesafety responsibilities. If the decision of the local fire official and the local building official is to apply the provisions of either the Florida Building Code or the Florida Fire Prevention Code and the Life Safety Code, the board may not alter the decision unless the board determines that the application of such code is not reasonable. If the decision of the local fire official and the local building official is to adopt an alternative to the codes, the local administrative board shall give due regard to the decision rendered by the local officials and may modify that decision if the administrative board adopts a better alternative, taking into consideration all relevant circumstances. In any case in which the local administrative board adopts alternatives to the decision rendered by the local fire official and the local building official, such alternatives shall provide an equivalent degree of lifesafety and an equivalent method of construction as the decision rendered by the local officials. (c) If the local building official and the local fire official are unable to agree on a resolution of the conflict between the Florida Building Code and the Florida Fire Prevention Code and the Life Safety Code, the local administrative board shall resolve the conflict in favor of the code which offers the greatest degree of lifesafety or alternatives which would provide an equivalent degree of lifesafety and an equivalent method of construction. (d) All decisions of the local administrative board or, if none exists, the local building official and the local fire official in regard to the application, enforcement, or interpretation of the Florida Fire Prevention Code, or conflicts between the Florida Fire Prevention Code and the Florida Building Code, are subject to review by a joint committee composed of members of the Florida Building Commission and the Fire Code Advisory Council. If the joint committee is unable to resolve conflicts between the codes as applied to a specific project, the matter shall be resolved pursuant to paragraph (1)(d). Decisions of the local administrative board related solely to the Florida Building Code are subject to review as set forth in s. 553.775 . (e) The local administrative board shall, to the greatest extent possible, be composed of members with expertise in building construction and firesafety standards. (f) All decisions of the local building official and local fire official and all decisions of the administrative board shall be in writing and shall be binding upon a person but do not limit the authority of the State Fire Marshal or the Florida Building Commission pursuant to paragraph (1)(d) and ss. 633.104 and 633.228 . Decisions of general application shall be indexed by building and fire code sections and shall be available for inspection during normal business hours. (12) Except within coastal building zones as defined in s. 161.54 , specification standards developed by nationally recognized code promulgation organizations to determine compliance with engineering criteria of the Florida Building Code for wind load design shall not apply to one or two family dwellings which are two stories or less in height unless approved by the commission for use or unless expressly made subject to said standards and criteria by local ordinance adopted in accordance with the provisions of subsection (4). (13) The Florida Building Code does not apply to, and no code enforcement action shall be brought with respect to, zoning requirements, land use requirements, and owner specifications or programmatic requirements which do not pertain to and govern the design, construction, erection, alteration, modification, repair, or demolition of public or private buildings, structures, or facilities or to programmatic requirements that do not pertain to enforcement of the Florida Building Code. Additionally, a local code enforcement agency may not administer or enforce the Florida Building Code to prevent the siting of any publicly owned facility, including, but not limited to, correctional facilities, juvenile justice facilities, or state universities, community colleges, or public education facilities, as provided by law. (14) The general provisions of the Florida Building Code for buildings and other structures shall not apply to commercial wireless communication towers when such general provisions are inconsistent with the provisions of the code controlling radio and television towers. This subsection is intended to be remedial in nature and to clarify existing law. (15) An agency or local government may not require that existing mechanical equipment located on or above the surface of a roof be installed in compliance with the requirements of the Florida Building Code except during reroofing when the equipment is being replaced or moved and is not in compliance with the provisions of the Florida Building Code relating to roof-mounted mechanical units. (16) The Florida Building Code must require that the illumination in classroom units be designed to provide and maintain an average of 40 foot-candles of light at each desktop. Public educational facilities must consider using light-emitting diode lighting before considering other lighting sources. (17) A provision of the International Residential Code relating to mandated fire sprinklers may not be incorporated into the Florida Building Code as adopted by the Florida Building Commission and may not be adopted as a local amendment to the Florida Building Code. This subsection does not prohibit the application of cost-saving incentives for residential fire sprinklers that are authorized in the International Residential Code upon a mutual agreement between the builder and the code official. This subsection does not apply to a local government that has a lawfully adopted ordinance relating to fire sprinklers which has been in effect since January 1, 2010. (18) In a single-family dwelling, makeup air is not required for range hood exhaust systems capable of exhausting: (a) Four hundred cubic feet per minute or less; or (b) More than 400 cubic feet per minute but no more than 800 cubic feet per minute if there are no gravity vent appliances within the conditioned living space of the structure. (19) The Florida Building Code shall require two fire service access elevators in all buildings with a height greater than 120 feet measured from the elevation of street-level access to the level of the highest occupiable floor. All remaining elevators, if any, shall be provided with Phase I and II emergency operations. Where a fire service access elevator is required, a 1-hour fire-rated fire service access elevator lobby with direct access from the fire service access elevator is not required if the fire service access elevator opens into an exit access corridor that is no less than 6 feet wide for its entire length and is at least 150 square feet with the exception of door openings, and has a minimum 1-hour fire rating with three-quarter hour fire and smoke rated openings; and during a fire event the fire service access elevator is pressurized and floor-to-floor smoke control is provided. However, where transient residential occupancies occur at floor levels more than 420 feet above the level of fire service access, a 1-hour fire-rated service access elevator lobby with direct access from the fire service access elevator is required. Standpipes in high-rise buildings of Florida Building Code — Building Occupancy Group R1 or R2 must be located in stairwells and are subject only to the requirements of the Florida Fire Prevention Code and NFPA 14, Standard for the Installation of Standpipes and Hose Systems, adopted by the State Fire Marshal. (20) The Florida Building Commission may not: (a) Adopt the 2016 version of the American Society of Heating, Refrigerating and Air-Conditioning Engineers Standard 9.4.1.1(g). (b) Adopt any provision that requires a door located in the opening between a garage and a single-family residence to be equipped with a self-closing device.

    source ↗
  • Fla. Stat. § 489.147 Prohibited property insurance practices; contract requirements. — Florida roofing contractor license

    489.147 Prohibited property insurance practices; contract requirements. — (1) As used in this section, the term: (a) “Prohibited advertisement” means any written or electronic communication by a contractor which encourages, instructs, or induces a consumer to contact a contractor or public adjuster for the purpose of making an insurance claim for roof damage, if such communication does not state in a font size of at least 12 points and at least half as large as the largest font size used in the communication that: 1. The consumer is responsible for payment of any insurance deductible; 2. It is insurance fraud punishable as a felony of the third degree for a contractor to knowingly or willfully, and with intent to injure, defraud, or deceive, pay, waive, or rebate all or part of an insurance deductible applicable to payment to the contractor for repairs to a property covered by a property insurance policy; and 3. It is insurance fraud punishable as a felony of the third degree to intentionally file an insurance claim containing any false, incomplete, or misleading information. The term includes, but is not limited to, door hangers, business cards, magnets, flyers, pamphlets, and e-mails. (b) “Residential property owner” means the person who holds the legal title to the residential real property that is the subject of and directly impacted by the action of a governmental entity. The term does not include a governmental entity. (c) “Soliciting” means contacting: 1. In person; 2. By electronic means, including, but not limited to, e-mail, telephone, and any other real-time communication directed to a specific person; or 3. By delivery to a specific person. (2) A contractor may not directly or indirectly engage in any of the following practices: (a) Soliciting a residential property owner by means of a prohibited advertisement. (b) Offering to a residential property owner a rebate, gift, gift card, cash, coupon, waiver of any insurance deductible, or any other thing of value in exchange for: 1. Allowing the contractor to conduct an inspection of the residential property owner’s roof; or 2. Making an insurance claim for damage to the residential property owner’s roof. (c) Offering, delivering, receiving, or accepting any compensation, inducement, or reward, for the referral of any services for which property insurance proceeds are payable. Payment by the residential property owner or insurance company to a contractor for roofing services rendered does not constitute compensation for a referral. (d) Interpreting policy provisions or advising an insured regarding coverages or duties under the insured’s property insurance policy or adjusting a property insurance claim on behalf of the insured, unless the contractor holds a license as a public adjuster pursuant to part VI of chapter 626. (e) Providing an insured with an agreement authorizing repairs without providing a good faith estimate of the itemized and detailed cost of services and materials for repairs undertaken pursuant to a property insurance claim. A contractor does not violate this paragraph if, as a result of the process of the insurer adjusting a claim, the actual cost of repairs differs from the initial estimate. (3) A contractor who violates this section is subject to disciplinary proceedings as set forth in s. 489.129 . A contractor may receive up to a $10,000 fine for each violation of this section. (4) For the purposes of this section: (a) The acts of any person on behalf of a contractor, including, but not limited to, the acts of a compensated employee or a nonemployee who is compensated for soliciting, shall be considered the actions of the contractor. (b) An unlicensed person who engages in an act prohibited by this section is guilty of unlicensed contracting and is subject to the penalties set forth in s. 489.13 . Notwithstanding s. 489.13 (3), an unlicensed person who violates this section may be fined up to $10,000 for each violation. (5) A contractor may not execute a contract with a residential property owner to repair or replace a roof without including a notice that the contractor may not engage in the practices set forth in paragraph (2)(b). If the contractor fails to include such notice, the residential property owner may void the contract within 10 days after executing it. (6)(a) A residential property owner may cancel a contract to replace or repair a roof without penalty or obligation within 10 days after the execution of the contract or by the official start date, whichever comes first, if the contract was entered into based on events that are subject of a declaration of a state of emergency by the Governor. For the purposes of this subsection, the official start date is the date on which work that includes the installation of materials that will be included in the final work on the roof commences, a final permit has been issued, or a temporary repair to the roof covering or roof has been made in compliance with the Florida Building Code. (b) A contractor executing a contract during a declaration of a state of emergency to replace or repair a roof of a residential property must include or add as an attachment to the contract the following language, in bold type of not less than 18 points, immediately before the space reserved for the signature of the residential property owner: “You, the residential property owner, may cancel this contract without penalty or obligation within 10 days after the execution of the contract or by the official start date, whichever comes first, because this contract was entered into during a state of emergency by the Governor. The official start date is the date on which work that includes the installation of materials that will be included in the final work on the roof commences, a final permit has been issued, or a temporary repair to the roof covering or roof system has been made in compliance with the Florida Building Code.” (c) The residential property owner must send the notice of cancellation by certified mail, return receipt requested, or other form of mailing that provides proof thereof, at the address specified in the contract.

    source ↗
  • Fla. Stat. § 489.142 Board powers relating to recovery; conduct of hearings and service. — Florida roofing contractor license

    489.142 Board powers relating to recovery; conduct of hearings and service. — (1) With respect to actions for recovery from the recovery fund, the board may intervene, enter an appearance, file an answer, defend the action, or take any action it deems appropriate and may take recourse through any appropriate method of review on behalf of the State of Florida. The board may delegate to the department by rule the authority to close any case when a claimant is not qualified to make a claim for recovery from the recovery fund under s. 489.141 (2); when after notice the claimant has failed to provide documentation in support of the claim as required by the board; or when the licensee has reached the aggregate limit. (2) Notwithstanding any other provision of law, the board shall cause a notice of hearing to be served 14 days in advance of the hearing on the claimant and on the licensee whose license is subject to suspension by s. 489.143 . Each notice shall inform the recipient of any administrative hearing or judicial review that is available under s. 120.569 , s. 120.57 , or s. 120.68 ; shall indicate the procedure that must be followed to obtain the hearing or judicial review; and shall state the time limits that apply. Service of the notice on the licensee shall be made in accordance with s. 455.275 . Service of the notice on the claimant shall be by regular United States mail at the address provided on the claim. The service of notice in accordance with this section is complete upon expiration of 14 days after deposit in the United States mail. Proof of service of a notice shall be made by entry in the records of the department that the notice was given. The entry shall be admissible in judicial and administrative proceedings of this state and shall constitute sufficient proof that notice was given. (3) Notwithstanding any other provision of law, board hearings on claims shall be conducted in accordance with ss. 120.569 and 120.57 (2). All claim hearings shall be conducted at the board’s regular meeting at the place, date, and time published. Orders of the board denying or awarding funds to a claimant constitute final orders that may be appealed in accordance with s. 120.68 . Orders awarding or denying claims shall be served in the same manner as notices of hearing in this section.

    source ↗
  • Fla. Stat. § 489.115 Certification and registration; endorsement; reciprocity; renewals; continuing education. — Florida painting contractor

    489.115 Certification and registration; endorsement; reciprocity; renewals; continuing education. — (1) No person may engage in the business of contracting in this state without first being certified or registered in the proper classification. (2)(a) The department shall issue a certificate or registration to each person qualified by the board and upon receipt of the original license fee. (b) Certification allows the certificateholder to engage in contracting only for the type of work covered by the certificate and only while the certificate is on active status. (3) The board shall certify as qualified for certification by endorsement any applicant who: (a) Meets the requirements for certification as set forth in this section; has passed a national, regional, state, or United States territorial licensing examination that is substantially equivalent to the examination required by this part; and has satisfied the requirements set forth in s. 489.111 ; (b) Holds a valid license to practice contracting issued by another state or territory of the United States, if the criteria for issuance of such license were substantially equivalent to Florida’s current certification criteria; (c) Holds a valid, current license to practice contracting issued by another state or territory of the United States, if the state or territory has entered into a reciprocal agreement with the board for the recognition of contractor licenses issued in that state, based on criteria for the issuance of such licenses that are substantially equivalent to the criteria for certification in this state; or (d) Has held a valid, current license to practice contracting issued by another state or territory of the United States for at least 10 years before the date of application and is applying for the same or similar license in this state, subject to subsections (5)-(9). The board may consider an applicant’s technical competence to ensure the applicant is able to meet the requirements of this state’s codes and standards for wind mitigation and water intrusion. The board may also consider whether such applicant has had a license to practice contracting revoked, suspended, or otherwise acted against by the licensing authority of another state, territory, or country. Such application must be made either when the license in another state or territory is active or within 2 years after such license was last active. Division I contractors and roofing contractors must complete a 2-hour course on the Florida Building Code which includes information on wind mitigation techniques. The required courses may be completed online. (4)(a) Each certificateholder or registrant who desires to continue as a certificateholder or registrant shall renew the certificate or registration every 2 years. The department shall mail each certificateholder and registrant an application for renewal. (b)1. Each certificateholder or registrant shall provide proof, in a form established by rule of the board, that the certificateholder or registrant has completed at least 14 classroom hours of at least 50 minutes each of continuing education courses during each biennium since the issuance or renewal of the certificate or registration. The board shall establish by rule that a portion of the required 14 hours must deal with the subject of workers’ compensation, business practices, workplace safety, and, for applicable licensure categories, wind mitigation methodologies, and 1 hour of which must deal with laws and rules. The board shall by rule establish criteria for the approval of continuing education courses and providers, including requirements relating to the content of courses and standards for approval of providers, and may by rule establish criteria for accepting alternative nonclassroom continuing education on an hour-for-hour basis. The board shall prescribe by rule the continuing education, if any, which is required during the first biennium of initial licensure. A person who has been licensed for less than an entire biennium must not be required to complete the full 14 hours of continuing education. 2. In addition, the board may approve specialized continuing education courses on compliance with the wind resistance provisions for one and two family dwellings contained in the Florida Building Code and any alternate methodologies for providing such wind resistance which have been approved for use by the Florida Building Commission. Division I certificateholders or registrants who demonstrate proficiency upon completion of such specialized courses may certify plans and specifications for one and two family dwellings to be in compliance with the code or alternate methodologies, as appropriate, except for dwellings located in floodways or coastal hazard areas as defined in ss. 60.3D and E of the National Flood Insurance Program. 3. The board shall require, by rule adopted pursuant to ss. 120.536 (1) and 120.54 , a specified number of hours in specialized or advanced module courses, approved by the Florida Building Commission, on any portion of the Florida Building Code, adopted pursuant to part IV of chapter 553, relating to the contractor’s respective discipline. (c) The certificateholder or registrant shall complete, sign, and forward the renewal application to the department, together with the appropriate fee. Upon receipt of the application and fee, the department shall renew the certificate or registration. (5)(a) As a prerequisite to the initial issuance or the renewal of a certificate or registration, the applicant shall submit an affidavit on a form provided by the board attesting to the fact that the applicant has obtained workers’ compensation insurance as required by chapter 440, public liability insurance, and property damage insurance for the safety and welfare of the public, in amounts determined by rule of the board. The board shall by rule establish a procedure to verify the accuracy of such affidavits based upon a random sample method. (b) In addition to the affidavit of insurance, as a prerequisite to the initial issuance of a certificate, the applicant shall furnish a credit report from a nationally recognized credit agency that reflects the financial responsibility of the applicant and evidence of financial responsibility, credit, and business reputation of either himself or herself or the business organization he or she desires to qualify. The board shall adopt rules defining financial responsibility based upon the applicant’s credit history, ability to be bonded, and any history of bankruptcy or assignment of receivers. The board may also adopt rules that would allow applicants to demonstrate financial responsibility, as an alternative to the foregoing, by providing minimum credit scores or bonds payable as prescribed for financially responsible officers. Such rules shall specify the financial responsibility grounds on which the board may refuse to qualify an applicant for certification. (c) If, within 60 days from the date the applicant is notified that he or she has qualified, he or she does not provide the evidence required, he or she shall apply to the department for an extension of time which shall be granted upon a showing of just cause. (d) An applicant for initial issuance of a certificate or registration shall submit as a prerequisite to qualifying for an exemption from workers’ compensation coverage requirements under s. 440.05 an affidavit attesting to the fact that the applicant will obtain an exemption within 30 days after the date the initial certificate or registration is issued by the board. (6) An applicant for initial issuance of a certificate or registration shall submit to a statewide criminal history records check through the Department of Law Enforcement. The Department of Business and Professional Regulation shall submit the requests for the criminal history records check to the Department of Law Enforcement for state processing, and the Department of Law Enforcement shall return the results to the department to determine if the applicant meets certification or registration requirements. If the applicant has been convicted of a felony, the board may deny licensure to the applicant based upon the severity of the crime, the relationship of the crime to contracting, or the potential for public harm. The board shall also, in denying or approving licensure, consider the length of time since the commission of the crime and the rehabilitation of the applicant. The board may not deny licensure to an applicant based solely upon a felony conviction or the applicant’s failure to provide proof of restoration of civil rights. (7) An initial applicant shall, along with the application, and a certificateholder or registrant shall, upon requesting a change of status, submit to the board a credit report from a nationally recognized credit agency that reflects the financial responsibility of the applicant or certificateholder or registrant. The credit report required for the initial applicant shall be considered the minimum evidence necessary to satisfy the board that he or she is financially responsible to be certified, has the necessary credit and business reputation to engage in contracting in the state, and has the minimum financial stability necessary to avoid the problem of financial mismanagement or misconduct. The board shall, by rule, adopt guidelines for determination of financial stability, which may include minimum requirements for net worth, cash, and bonding for Division I certificateholders of no more than $20,000 and for Division II certificateholders of no more than $10,000. Fifty percent of the financial requirements may be met by completing a 14-hour financial responsibility course approved by the board. (8) If a certificateholder or registrant holds a license under both this part and part II and is required to have continuing education courses under s. 489.517 (3), the certificateholder or registrant may apply those course hours for workers’ compensation, workplace safety, and business practices obtained under part II to the requirements under this part. (9) An initial applicant shall submit, along with the application, a complete set of fingerprints to the department. The fingerprints shall be submitted to the Department of Law Enforcement for state processing, and the Department of Law Enforcement shall forward them to the Federal Bureau of Investigation for national processing for the purpose of determining if the applicant has a criminal history record. The department shall and the board may review the background results to determine if an applicant meets licensure requirements. The cost for the fingerprint processing shall be borne by the person subject to the background screening. These fees are to be collected by the authorized agencies or vendors. The authorized agencies or vendors are responsible for paying the processing costs to the Department of Law Enforcement.

    source ↗
  • Fla. Stat. § 489.113 Qualifications for practice; restrictions. — Florida HVAC air conditioning contractor license

    489.113 Qualifications for practice; restrictions. — (1) Any person who desires to engage in contracting on a statewide basis shall, as a prerequisite thereto, establish his or her competency and qualifications to be certified pursuant to this part. To establish competency, a person shall pass the appropriate examination approved by the board and certified by the department. If an applicant has received a baccalaureate degree in building construction from an accredited 4-year college, or a related degree as approved by the board by rule, and has a grade point average of 3.0 or higher, such applicant is only required to take and pass the business and finance portion of the examination. Any person who desires to engage in contracting on other than a statewide basis shall, as a prerequisite thereto, be registered pursuant to this part, unless exempted by this part. (2) A person must be certified or registered in order to engage in the business of contracting in this state. However, for purposes of complying with the provisions of this chapter, a subcontractor who is not certified or registered may perform construction work under the supervision of a person who is certified or registered, provided that the work is within the scope of the supervising contractor’s license, the supervising contractor is responsible for the work, and the subcontractor being supervised is not engaged in construction work that would require a license as a contractor under any of the categories listed in s. 489.105 (3)(d)-(o). This subsection does not affect the application of any local construction licensing ordinances. To enforce this subsection: (a) The department shall issue a cease and desist order to prohibit any person from engaging in the business of contracting who does not hold the required certification or registration for the work being performed under this part. For the purpose of enforcing a cease and desist order, the department may file a proceeding in the name of the state seeking issuance of an injunction or a writ of mandamus against any person who violates any provision of such order. (b) A county, municipality, or local licensing board created by special act may issue a cease and desist order to prohibit any person from engaging in the business of contracting who does not hold the required certification or registration for the work being performed under this part. (3) A contractor shall subcontract all electrical, mechanical, plumbing, roofing, sheet metal, swimming pool, and air-conditioning work, unless such contractor holds a state certificate or registration in the respective trade category, however: (a) A general, building, or residential contractor, except as otherwise provided in this part, shall be responsible for any construction or alteration of a structural component of a building or structure, and any certified general contractor or certified underground utility and excavation contractor may perform clearing and grubbing, grading, excavation, and other site work for any construction project in the state. Any certified building contractor or certified residential contractor may perform clearing and grubbing, grading, excavation, and other site work for any construction project in this state, limited to the lot on which any specific building is located. (b) A general, building, or residential contractor shall not be required to subcontract the installation, or repair made under warranty, of wood shingles, wood shakes, or asphalt or fiberglass shingle roofing materials on a new building of his or her own construction. (c) A general contractor shall not be required to subcontract structural swimming pool work. All other swimming pool work shall be subcontracted to an appropriately licensed certified or registered swimming pool contractor. (d) A general contractor shall not be required to subcontract the construction of a main sanitary sewer collection system, storm collection system, or water distribution system, not including the continuation of utility lines from the mains to the buildings, and may perform any of the services, on public or private property, for which a license as an underground utility and excavation contractor is required under this part. (e) A general contractor shall not be required to subcontract the continuation of utility lines from the mains in mobile home parks, and such continuations are to be considered a part of the main sewer collection and main water distribution systems. (f) A solar contractor shall not be required to subcontract minor, as defined by board rule, electrical, mechanical, plumbing, or roofing work so long as that work is within the scope of the license held by the solar contractor and where such work exclusively pertains to the installation of residential solar energy equipment as defined by rules of the board adopted in conjunction with the Electrical Contracting Licensing Board. (g) No general, building, or residential contractor certified after 1973 shall act as, hold himself or herself out to be, or advertise himself or herself to be a roofing contractor unless he or she is certified or registered as a roofing contractor. (4)(a) When a certificateholder desires to engage in contracting in any area of the state, as a prerequisite therefor, he or she shall be required only to exhibit to the local building official, tax collector, or other person in charge of the issuance of licenses and building permits in the area evidence of holding a current certificate and to pay the fee for the occupational license and building permit required of other persons. (b) Notwithstanding the provisions of paragraph (a), a local construction regulation board may deny, suspend, or revoke the authority of a certified contractor to obtain a building permit or limit such authority to obtaining a permit or permits with specific conditions, if the local construction regulation board has found such contractor, through the public hearing process, to be guilty of fraud or a willful building code violation within the county or municipality that the local construction regulation board represents or if the local construction regulation board has proof that such contractor, through the public hearing process, has been found guilty in another county or municipality within the past 12 months, of fraud or a willful building code violation and finds, after providing notice of an opportunity to be heard to the contractor, that such fraud or violation would have been fraud or a violation if committed in the county or municipality that the local construction board represents. Notification of and information concerning such permit denial shall be submitted to the department within 15 days after the local construction regulation board decides to deny the permit. (c) The local government may also deny issuance of, or may suspend, any outstanding building permit where a contractor fails or refuses to provide proof of public liability and property damage insurance coverage as required by s. 489.115 (5) and workers’ compensation insurance coverage as required by s. 489.114 . (d) It is the policy of the state that the purpose of regulation is to protect the public by attaining compliance with the policies established in law. Fines and other penalties are provided in order to ensure compliance; however, the collection of fines and the imposition of penalties are intended to be secondary to the primary goal of attaining compliance with state laws and local jurisdiction ordinances. It is the intent of the Legislature that a local jurisdiction agency charged with enforcing regulatory laws shall issue a notice of noncompliance as its first response to a minor violation of a regulatory law in any instance in which it is reasonable to assume that the violator was unaware of such a law or unclear as to how to comply with it. A violation of a regulatory law is a “minor violation” if it does not result in economic or physical harm to a person or adversely affect the public health, safety, or welfare or create a significant threat of such harm. A “notice of noncompliance” is a notification by the local jurisdiction agency charged with enforcing the ordinance, which is issued to the licensee that is subject to the ordinance. A notice of noncompliance should not be accompanied with a fine or other disciplinary penalty. It should identify the specific ordinance that is being violated, provide information on how to comply with the ordinance, and specify a reasonable time for the violator to comply with the ordinance. Failure of a licensee to take action correcting the violation within a set period of time would then result in the institution of further disciplinary proceedings. (5) The certificate is not transferable. (6)(a) The board shall, by rule, designate those types of specialty contractors which may be certified under this part. The limit of the scope of work and responsibility of a specialty contractor shall be established by the board by rule. However, a certified specialty contractor category established by board rule exists as a voluntary statewide licensing category and does not create a mandatory licensing requirement. Any mandatory statewide construction contracting licensure requirement may only be established through specific statutory provision. (b) By July 1, 2025, the board shall, by rule, establish certified specialty contractor categories for voluntary licensure for all of the following: 1. Structural aluminum or screen enclosures. 2. Marine seawall work. 3. Marine bulkhead work. 4. Marine dock work. 5. Marine pile driving. 6. Structural masonry. 7. Structural prestressed, precast concrete work. 8. Rooftop solar heating installation. 9. Structural steel. 10. Window and door installation, including garage door installation and hurricane or windstorm protection. 11. Plaster and lath. 12. Structural carpentry. (7) If an eligible applicant fails any contractor’s written examination, except the general and building contractors’ examination, and provides the board with acceptable proof of lack of comprehension of written examinations, the applicant may petition the board to be administered a uniform oral examination, subject to the following conditions: (a) The applicant documents 10 years of experience in the appropriate construction craft. (b) The applicant files written recommendations concerning his or her competency in the appropriate construction craft. (c) The applicant is administered only one oral examination within a period of 1 year. (8) Any public record of the board, when certified by the executive director of the board or the executive director’s representative, may be received as prima facie evidence in any administrative or judicial proceeding. (9)(a) This part does not prevent any contractor from acting as a prime contractor where the majority of the work to be performed under the contract is within the scope of his or her license or from subcontracting to other licensed contractors that remaining work which is part of the project contracted. (b) This part, chapter 471, chapter 481, or any other provision of law does not: 1. Prevent any licensed engineer or architect from contracting directly with a licensed contractor for the preparation of plans, specifications, or a master design manual addressing structural designs used to make an application for building permits. 2. Require a licensed engineer or architect, when preparing drawings, specifications, plans, or master design manuals for use by any licensed contractor, to prepare site-specific drawings, specifications, or plans for the design and construction of single-family and two-family dwellings; swimming pools, spas, or screened enclosures; or any other structure not exceeding 1,200 square feet or one story in height. For the purpose of issuing building permits, local building officials shall accept such drawings, specifications, or plans when submitted by any licensed contractor. Upon good cause shown, local government code enforcement agencies may accept or reject plans prepared by persons licensed under chapter 471, chapter 481, or this chapter. As used in this section, the term “master design manual” means a restrictive design manual intended to be used to design, permit, and construct structures as described in this section. Any such manual must be prepared by a licensed engineer or architect and specifically detail the limits of its use, including, but not limited to, the structure type, size, materials, loading conditions, time limits, applicable codes, and associated criteria. The manual must also detail the required training for the contractor, engineer, or architect using the manual. All master design manuals must be peer reviewed by an independent licensed engineer or architect having no financial interest in the development of the manual or the construction of structures pursuant to the manual. The engineer or architect conducting the peer review must be identified in the manual. (c) Notwithstanding anything in this chapter or any other provision of law, a licensed engineer or architect is not required for the preparation or use of any design guide adopted by the Florida Building Commission as part of the building code pursuant to s. 553.73 . (10) The addition of a new type of contractor or the expansion of the scope of practice of any type of contractor under this part shall not limit the scope of practice of any existing type of contractor under this part unless the Legislature expressly provides such a limitation. (11) Any local act, law, ordinance, or regulation, including, but not limited to, a local building code or building permit requirement, of a county, municipality, or other political subdivision that pertains to hoisting equipment including power-operated cranes, derricks, hoists, elevators, and conveyors used in construction, demolition, or excavation work, that is not already preempted by the Occupational Safety and Health Administration under 29 C.F.R. parts 1910 and 1926, including, but not limited to, local worksite regulation regarding hurricane preparedness or public safety, is prohibited and is preempted to the state. This subsection does not apply to the regulation of elevators under chapter 399 or to airspace height restrictions in chapter 333.

    source ↗
  • Fla. Stat. § 489.107 Construction Industry Licensing Board. — Florida HVAC air conditioning contractor license

    489.107 Construction Industry Licensing Board. — (1) To carry out the provisions of this part, there is created within the department the Construction Industry Licensing Board. Members shall be appointed by the Governor, subject to confirmation by the Senate. Members shall be appointed for 4-year terms. A vacancy on the board shall be filled for the unexpired portion of the term in the same manner as the original appointment. No member shall serve more than two consecutive 4-year terms or more than 11 years on the board. (2) The board shall consist of 18 members, of whom: (a) Four are primarily engaged in business as general contractors; (b) Three are primarily engaged in business as building contractors or residential contractors, however, at least one building contractor and one residential contractor shall be appointed; (c) One is primarily engaged in business as a roofing contractor; (d) One is primarily engaged in business as a sheet metal contractor; (e) One is primarily engaged in business as an air-conditioning contractor; (f) One is primarily engaged in business as a mechanical contractor; (g) One is primarily engaged in business as a pool contractor; (h) One is primarily engaged in business as a plumbing contractor; (i) One is primarily engaged in business as an underground utility and excavation contractor; (j) Two are consumer members who are not, and have never been, members or practitioners of a profession regulated by the board or members of any closely related profession; and (k) Two are building officials of a municipality or county. (3) To be eligible to serve, each contractor member must have been certified by the board to operate as a contractor in the category with respect to which the member is appointed, be actively engaged in the construction business, and have been so engaged for a period of not less than 5 consecutive years before the date of appointment. Each appointee must be a citizen and resident of the state. (4) The board shall be divided into two divisions, Division I and Division II. (a) Division I is comprised of the general contractor, building contractor, and residential contractor members of the board; one of the members appointed pursuant to paragraph (2)(j); and one of the members appointed pursuant to paragraph (2)(k). Division I has jurisdiction over the regulation of general contractors, building contractors, and residential contractors. (b) Division II is comprised of the roofing contractor, sheet metal contractor, air-conditioning contractor, mechanical contractor, pool contractor, plumbing contractor, and underground utility and excavation contractor members of the board; one of the members appointed pursuant to paragraph (2)(j); and one of the members appointed pursuant to paragraph (2)(k). Division II has jurisdiction over the regulation of contractors defined in s. 489.105 (3)(d)-(p). (c) Jurisdiction for the regulation of specialty contractors defined in s. 489.105 (3)(q) shall lie with the division having jurisdiction over the scope of work of the specialty contractor as defined by board rule. (5) Five members of Division I constitute a quorum, and five members of Division II constitute a quorum. The combined divisions shall meet together at such times as the board deems necessary, but neither division, nor any committee thereof, shall take action on any matter under the jurisdiction of the other division. However, if either division is unable to obtain a quorum for the purpose of conducting disciplinary proceedings, it may request members of the other division, who are otherwise qualified to serve on the division unable to obtain a quorum, to join in its deliberations. Such additional members shall vote and count toward a quorum only during those disciplinary proceedings. (6) The Construction Industry Licensing Board and the Electrical Contractors’ Licensing Board shall each appoint a committee to meet jointly at least twice a year.

    source ↗
  • Fla. Stat. § 489.105 Definitions. — Florida HVAC air conditioning contractor license

    489.105 Definitions. — As used in this part: (1) “Board” means the Construction Industry Licensing Board. (2) “Department” means the Department of Business and Professional Regulation. (3) “Contractor” means the person who is qualified for, and is only responsible for, the project contracted for and means, except as exempted in this part, the person who, for compensation, undertakes to, submits a bid to, or does himself or herself or by others construct, repair, alter, remodel, add to, demolish, subtract from, or improve any building or structure, including related improvements to real estate, for others or for resale to others; and whose job scope is substantially similar to the job scope described in one of the paragraphs of this subsection. For the purposes of regulation under this part, the term “demolish” applies only to demolition of steel tanks more than 50 feet in height; towers more than 50 feet in height; other structures more than 50 feet in height; and all buildings or residences. Contractors are subdivided into two divisions, Division I, consisting of those contractors defined in paragraphs (a)-(c), and Division II, consisting of those contractors defined in paragraphs (d)-(q): (a) “General contractor” means a contractor whose services are unlimited as to the type of work which he or she may do, who may contract for any activity requiring licensure under this part, and who may perform any work requiring licensure under this part, except as otherwise expressly provided in s. 489.113 . (b) “Building contractor” means a contractor whose services are limited to construction of commercial buildings and single-dwelling or multiple-dwelling residential buildings, which do not exceed three stories in height, and accessory use structures in connection therewith or a contractor whose services are limited to remodeling, repair, or improvement of any size building if the services do not affect the structural members of the building. (c) “Residential contractor” means a contractor whose services are limited to construction, remodeling, repair, or improvement of one-family, two-family, or three-family residences not exceeding two habitable stories above no more than one uninhabitable story and accessory use structures in connection therewith. (d) “Sheet metal contractor” means a contractor whose services are unlimited in the sheet metal trade and who has the experience, knowledge, and skill necessary for the manufacture, fabrication, assembling, handling, erection, installation, dismantling, conditioning, adjustment, insulation, alteration, repair, servicing, or design, if not prohibited by law, of ferrous or nonferrous metal work of U.S. No. 10 gauge or its equivalent or lighter gauge and of other materials, including, but not limited to, fiberglass, used in lieu thereof and of air-handling systems, including the setting of air-handling equipment and reinforcement of same, the balancing of air-handling systems, and any duct cleaning and equipment sanitizing that requires at least a partial disassembling of the system. (e) “Roofing contractor” means a contractor whose services are unlimited in the roofing trade and who has the experience, knowledge, and skill to install, maintain, repair, alter, extend, or design, if not prohibited by law, and use materials and items used in the installation, maintenance, extension, and alteration of all kinds of roofing, waterproofing, and coating, except when coating is not represented to protect, repair, waterproof, stop leaks, or extend the life of the roof. The scope of work of a roofing contractor also includes skylights and any related work, required roof-deck attachments, and any repair or replacement of wood roof sheathing or fascia as needed during roof repair or replacement and any related work. (f) “Class A air-conditioning contractor” means a contractor whose services are unlimited in the execution of contracts requiring the experience, knowledge, and skill to install, maintain, repair, fabricate, alter, extend, or design, if not prohibited by law, central air-conditioning, refrigeration, heating, and ventilating systems, including duct work in connection with a complete system if such duct work is performed by the contractor as necessary to complete an air-distribution system, boiler and unfired pressure vessel systems, and all appurtenances, apparatus, or equipment used in connection therewith, and any duct cleaning and equipment sanitizing that requires at least a partial disassembling of the system; to install, maintain, repair, fabricate, alter, extend, or design, if not prohibited by law, piping, insulation of pipes, vessels and ducts, pressure and process piping, and pneumatic control piping; to replace, disconnect, or reconnect power wiring on the line or load side of the dedicated existing electrical disconnect switch on single phase electrical systems; to repair or replace power wiring, disconnects, breakers, or fuses for dedicated HVAC circuits with proper use of a circuit breaker lock; to install, disconnect, and reconnect low voltage heating, ventilating, and air-conditioning control wiring; and to install a condensate drain from an air-conditioning unit to an existing safe waste or other approved disposal other than a direct connection to a sanitary system. The scope of work for such contractor also includes any excavation work incidental thereto, but does not include any work such as liquefied petroleum or natural gas fuel lines within buildings, except for disconnecting or reconnecting changeouts of liquefied petroleum or natural gas appliances within buildings; potable water lines or connections thereto; sanitary sewer lines; swimming pool piping and filters; or electrical power wiring. A Class A air-conditioning contractor may test and evaluate central air-conditioning, refrigeration, heating, and ventilating systems, including duct work; however, a mandatory licensing requirement is not established for the performance of these specific services. (g) “Class B air-conditioning contractor” means a contractor whose services are limited to 25 tons of cooling and 500,000 Btu of heating in any one system in the execution of contracts requiring the experience, knowledge, and skill to install, maintain, repair, fabricate, alter, extend, or design, if not prohibited by law, central air-conditioning, refrigeration, heating, and ventilating systems, including duct work in connection with a complete system only to the extent such duct work is performed by the contractor as necessary to complete an air-distribution system being installed under this classification, and any duct cleaning and equipment sanitizing that requires at least a partial disassembling of the system; to install, maintain, repair, fabricate, alter, extend, or design, if not prohibited by law, piping and insulation of pipes, vessels, and ducts; to replace, disconnect, or reconnect power wiring on the line or load side of the dedicated existing electrical disconnect switch on single phase electrical systems; to repair or replace power wiring, disconnects, breakers, or fuses for dedicated HVAC circuits with proper use of a circuit breaker lock; to install, disconnect, and reconnect low voltage heating, ventilating, and air-conditioning control wiring; and to install a condensate drain from an air-conditioning unit to an existing safe waste or other approved disposal other than a direct connection to a sanitary system. The scope of work for such contractor also includes any excavation work incidental thereto, but does not include any work such as liquefied petroleum or natural gas fuel lines within buildings, except for disconnecting or reconnecting changeouts of liquefied petroleum or natural gas appliances within buildings; potable water lines or connections thereto; sanitary sewer lines; swimming pool piping and filters; or electrical power wiring. A Class B air-conditioning contractor may test and evaluate central air-conditioning, refrigeration, heating, and ventilating systems, including duct work; however, a mandatory licensing requirement is not established for the performance of these specific services. (h) “Class C air-conditioning contractor” means a contractor whose business is limited to the servicing of air-conditioning, heating, or refrigeration systems, including any duct cleaning and equipment sanitizing that requires at least a partial disassembling of the system, and whose certification or registration, issued pursuant to this part, was valid on October 1, 1988. Only a person who was registered or certified as a Class C air-conditioning contractor as of October 1, 1988, shall be so registered or certified after October 1, 1988. However, the board shall continue to license and regulate those Class C air-conditioning contractors who held Class C licenses before October 1, 1988. (i) “Mechanical contractor” means a contractor whose services are unlimited in the execution of contracts requiring the experience, knowledge, and skill to install, maintain, repair, fabricate, alter, extend, or design, if not prohibited by law, central air-conditioning, refrigeration, heating, and ventilating systems, including duct work in connection with a complete system if such duct work is performed by the contractor as necessary to complete an air-distribution system, boiler and unfired pressure vessel systems, lift station equipment and piping, and all appurtenances, apparatus, or equipment used in connection therewith, and any duct cleaning and equipment sanitizing that requires at least a partial disassembling of the system; to install, maintain, repair, fabricate, alter, extend, or design, if not prohibited by law, piping, insulation of pipes, vessels and ducts, pressure and process piping, pneumatic control piping, gasoline tanks and pump installations and piping for same, standpipes, air piping, vacuum line piping, oxygen lines, nitrous oxide piping, ink and chemical lines, fuel transmission lines, liquefied petroleum gas lines within buildings, and natural gas fuel lines within buildings; to replace, disconnect, or reconnect power wiring on the line or load side of the dedicated existing electrical disconnect switch on single phase electrical systems; to repair or replace power wiring, disconnects, breakers, or fuses for dedicated HVAC circuits with proper use of a circuit breaker lock; to install, disconnect, and reconnect low voltage heating, ventilating, and air-conditioning control wiring; and to install a condensate drain from an air-conditioning unit to an existing safe waste or other approved disposal other than a direct connection to a sanitary system. The scope of work for such contractor also includes any excavation work incidental thereto, but does not include any work such as potable water lines or connections thereto, sanitary sewer lines, swimming pool piping and filters, or electrical power wiring. A mechanical contractor may test and evaluate central air-conditioning, refrigeration, heating, and ventilating systems, including duct work; however, a mandatory licensing requirement is not established for the performance of these specific services. (j) “Commercial pool/spa contractor” means a contractor whose scope of work involves, but is not limited to, the construction, repair, and servicing of any swimming pool, or hot tub or spa, whether public, private, or otherwise, regardless of use. The scope of work includes the installation, repair, or replacement of existing equipment, any cleaning or equipment sanitizing that requires at least a partial disassembling, excluding filter changes, and the installation of new pool/spa equipment, interior finishes, the installation of package pool heaters, the installation of all perimeter piping and filter piping, and the construction of equipment rooms or housing for pool/spa equipment, and also includes the scope of work of a swimming pool/spa servicing contractor. The scope of such work does not include direct connections to a sanitary sewer system or to potable water lines. The installation, construction, modification, or replacement of equipment permanently attached to and associated with the pool or spa for the purpose of water treatment or cleaning of the pool or spa requires licensure; however, the usage of such equipment for the purposes of water treatment or cleaning does not require licensure unless the usage involves construction, modification, or replacement of such equipment. Water treatment that does not require such equipment does not require a license. In addition, a license is not required for the cleaning of the pool or spa in a way that does not affect the structural integrity of the pool or spa or its associated equipment. (k) “Residential pool/spa contractor” means a contractor whose scope of work involves, but is not limited to, the construction, repair, and servicing of a residential swimming pool, or hot tub or spa, regardless of use. The scope of work includes the installation, repair, or replacement of existing equipment, any cleaning or equipment sanitizing that requires at least a partial disassembling, excluding filter changes, and the installation of new pool/spa equipment, interior finishes, the installation of package pool heaters, the installation of all perimeter piping and filter piping, and the construction of equipment rooms or housing for pool/spa equipment, and also includes the scope of work of a swimming pool/spa servicing contractor. The scope of such work does not include direct connections to a sanitary sewer system or to potable water lines. The installation, construction, modification, or replacement of equipment permanently attached to and associated with the pool or spa for the purpose of water treatment or cleaning of the pool or spa requires licensure; however, the usage of such equipment for the purposes of water treatment or cleaning does not require licensure unless the usage involves construction, modification, or replacement of such equipment. Water treatment that does not require such equipment does not require a license. In addition, a license is not required for the cleaning of the pool or spa in a way that does not affect the structural integrity of the pool or spa or its associated equipment. (l) “Swimming pool/spa servicing contractor” means a contractor whose scope of work involves, but is not limited to, the repair and servicing of a swimming pool, or hot tub or spa, whether public or private, or otherwise, regardless of use. The scope of work includes the repair or replacement of existing equipment, any cleaning or equipment sanitizing that requires at least a partial disassembling, excluding filter changes, and the installation of new pool/spa equipment, interior refinishing, the reinstallation or addition of pool heaters, the repair or replacement of all perimeter piping and filter piping, the repair of equipment rooms or housing for pool/spa equipment, and the substantial or complete draining of a swimming pool, or hot tub or spa, for the purpose of repair or renovation. The scope of such work does not include direct connections to a sanitary sewer system or to potable water lines. The installation, construction, modification, substantial or complete disassembly, or replacement of equipment permanently attached to and associated with the pool or spa for the purpose of water treatment or cleaning of the pool or spa requires licensure; however, the usage of such equipment for the purposes of water treatment or cleaning does not require licensure unless the usage involves construction, modification, substantial or complete disassembly, or replacement of such equipment. Water treatment that does not require such equipment does not require a license. In addition, a license is not required for the cleaning of the pool or spa in a way that does not affect the structural integrity of the pool or spa or its associated equipment. (m) “Plumbing contractor” means a contractor whose services are unlimited in the plumbing trade and includes contracting business consisting of the execution of contracts requiring the experience, financial means, knowledge, and skill to install, maintain, repair, alter, extend, or, if not prohibited by law, design plumbing. A plumbing contractor may install, maintain, repair, alter, extend, or, if not prohibited by law, design the following without obtaining an additional local regulatory license, certificate, or registration: sanitary drainage or storm drainage facilities, water and sewer plants and substations, venting systems, public or private water supply systems, septic tanks, drainage and supply wells, swimming pool piping, irrigation systems, and solar heating water systems and all appurtenances, apparatus, or equipment used in connection therewith, including boilers and pressure process piping and including the installation of water, natural gas, liquefied petroleum gas and related venting, and storm and sanitary sewer lines. The scope of work of the plumbing contractor also includes the design, if not prohibited by law, and installation, maintenance, repair, alteration, or extension of air-piping, vacuum line piping, oxygen line piping, nitrous oxide piping, and all related medical gas systems; fire line standpipes and fire sprinklers if authorized by law; ink and chemical lines; fuel oil and gasoline piping and tank and pump installation, except bulk storage plants; and pneumatic control piping systems, all in a manner that complies with all plans, specifications, codes, laws, and regulations applicable. The scope of work of the plumbing contractor applies to private property and public property, including any excavation work incidental thereto, and includes the work of the specialty plumbing contractor. Such contractor shall subcontract, with a qualified contractor in the field concerned, all other work incidental to the work but which is specified as being the work of a trade other than that of a plumbing contractor. This definition does not limit the scope of work of any specialty contractor certified pursuant to s. 489.113 (6) and does not require certification or registration under this part as a category I liquefied petroleum gas dealer, or category V LP gas installer, as defined in s. 527.01 , who is licensed under chapter 527 or an authorized employee of a public natural gas utility or of a private natural gas utility regulated by the Public Service Commission when disconnecting and reconnecting water lines in the servicing or replacement of an existing water heater. A plumbing contractor may perform drain cleaning and clearing and install or repair rainwater catchment systems; however, a mandatory licensing requirement is not established for the performance of these specific services. (n) “Underground utility and excavation contractor” means a contractor whose services are limited to the construction, installation, and repair, on public or private property, whether accomplished through open excavations or through other means, including, but not limited to, directional drilling, auger boring, jacking and boring, trenchless technologies, wet and dry taps, grouting, and slip lining, of main sanitary sewer collection systems, main water distribution systems, storm sewer collection systems, and the continuation of utility lines from the main systems to a point of termination up to and including the meter location for the individual occupancy, sewer collection systems at property line on residential or single-occupancy commercial properties, or on multioccupancy properties at manhole or wye lateral extended to an invert elevation as engineered to accommodate future building sewers, water distribution systems, or storm sewer collection systems at storm sewer structures. However, an underground utility and excavation contractor may install empty underground conduits in rights-of-way, easements, platted rights-of-way in new site development, and sleeves for parking lot crossings no smaller than 2 inches in diameter if each conduit system installed is designed by a licensed professional engineer or an authorized employee of a municipality, county, or public utility and the installation of such conduit does not include installation of any conductor wiring or connection to an energized electrical system. An underground utility and excavation contractor may not install piping that is an integral part of a fire protection system as defined in s. 633.102 beginning at the point where the piping is used exclusively for such system. (o) “Solar contractor” means a contractor whose services consist of the installation, alteration, repair, maintenance, relocation, or replacement of solar panels for potable solar water heating systems, swimming pool solar heating systems, and photovoltaic systems and any appurtenances, apparatus, or equipment used in connection therewith, whether public, private, or otherwise, regardless of use. A contractor, certified or registered pursuant to this chapter, is not required to become a certified or registered solar contractor or to contract with a solar contractor in order to provide services enumerated in this paragraph that are within the scope of the services such contractors may render under this part. (p) “Pollutant storage systems contractor” means a contractor whose services are limited to, and who has the experience, knowledge, and skill to install, maintain, repair, alter, extend, or design, if not prohibited by law, and use materials and items used in the installation, maintenance, extension, and alteration of, pollutant storage tanks. Any person installing a pollutant storage tank shall perform such installation in accordance with the standards adopted pursuant to s. 376.303 . (q) “Specialty contractor” means a contractor whose scope of work and responsibility is limited to a particular phase of construction established in a category adopted by board rule and whose scope is limited to a subset of the activities described in one of the paragraphs of this subsection. (4) “Primary qualifying agent” means a person who possesses the requisite skill, knowledge, and experience, and has the responsibility, to supervise, direct, manage, and control the contracting activities of the business organization with which he or she is connected; who has the responsibility to supervise, direct, manage, and control construction activities on a job for which he or she has obtained the building permit; and whose technical and personal qualifications have been determined by investigation and examination as provided in this part, as attested by the department. (5) “Secondary qualifying agent” means a person who possesses the requisite skill, knowledge, and experience, and has the responsibility to supervise, direct, manage, and control construction activities on a job for which he or she has obtained a permit, and whose technical and personal qualifications have been determined by investigation and examination as provided in this part, as attested by the department. (6) “Contracting” means, except as exempted in this part, engaging in business as a contractor and includes, but is not limited to, performance of any of the acts as set forth in subsection (3) which define types of contractors. The attempted sale of contracting services and the negotiation or bid for a contract on these services also constitutes contracting. If the services offered require licensure or agent qualification, the offering, negotiation for a bid, or attempted sale of these services requires the corresponding licensure. However, the term “contracting” shall not extend to an individual, partnership, corporation, trust, or other legal entity that offers to sell or sells completed residences on property on which the individual or business entity has any legal or equitable interest, or to the individual or business entity that offers to sell or sells manufactured or factory-built buildings that will be completed on site on property on which either party to a contract has any legal or equitable interest, if the services of a qualified contractor certified or registered pursuant to the requirements of this chapter have been or will be retained for the purpose of constructing or completing such residences. (7) “Certificate” means a certificate of competency issued by the department as provided in this part. (8) “Certified contractor” means any contractor who possesses a certificate of competency issued by the department and who shall be allowed to contract in any jurisdiction in the state without being required to fulfill the competency requirements of that jurisdiction. (9) “Registration” means registration with the department as provided in this part. (10) “Registered contractor” means any contractor who has registered with the department pursuant to fulfilling the competency requirements in the jurisdiction for which the registration is issued. Registered contractors may contract only in such jurisdictions. (11) “Certification” means the act of obtaining or holding a certificate of competency from the department as provided in this part. (12) “Local construction regulation board” means a board, composed of not fewer than three residents of a county or municipality, which the governing body of that county or municipality may create and appoint to maintain the proper standard of construction of that county or municipality. (13) “Business organization” means any partnership, corporation, business trust, joint venture, or other legal entity which engages or offers to engage in the business of contracting or acts as a contractor as defined in this section. (14) “Financially responsible officer” means a person other than the primary qualifying agent who with the approval of the board assumes personal responsibility for all financial aspects of the business organization. (15) “Structural component” means any vertical or horizontal load-bearing member of a structure which supports dead or live loads in addition to its own weight and includes, but is not limited to, a foundation, an exterior or interior load-bearing wall, a column, a column beam, a floor, and a roof structure. (16) “Arbitration” means a process whereby a neutral third person or panel, called an arbitrator or arbitration panel, considers the facts and arguments presented by the parties and renders a decision which is binding on the parties. (17) “Pollutant storage tank” means a tank, together with associated piping or dispensing facilities, which is or could be used for the storage or supply of pollutants as defined in s. 376.301 and which is required to be registered under chapter 17-761, Florida Administrative Code. (18) “Tank” means any container other than one which is aboveground and either elevated or situated upon an impermeable surface, or which is located in an accessible underground area and either elevated or situated upon an impermeable surface therein, in such manner that any leak in such container may be readily detected. (19) “Initial issuance” means the first time a certificate or registration is granted to an individual or business organization, including the first time an individual becomes a qualifying agent for that business organization and the first time a business organization is qualified by that individual.

    source ↗
  • Fla. Stat. § 553.844 Windstorm loss mitigation; requirements for roofs and opening protection

    553.844

    Windstorm loss mitigation; requirements for roofs and opening protection.

    —

    (1)

    The Legislature finds that:

    (a)

    The effects of recent hurricanes on the state have demonstrated the effectiveness of the Florida Building Code in reducing property damage to buildings constructed in accordance with its requirements, and have also exposed a vulnerability of some construction undertaken prior to implementation of the Florida Building Code.

    (b)

    Hurricanes represent a continuing threat to the health, safety, and welfare of the residents of this state due to the direct destructive effects of hurricanes as well as their effects on windstorm insurance rates.

    (c)

    The mitigation of property damage constitutes a valid and recognized objective of the Florida Building Code.

    (d)

    Cost-effective techniques for integrating proven methods of the Florida Building Code into buildings built prior to its implementation benefit all residents of the state as a whole.

    (2)

    The Florida Building Commission shall:

    (a)

    Analyze the extent to which a proposed Florida Building Code provision will mitigate property damage to buildings and their contents in evaluating that proposal. If the nature of the proposed Florida Building Code provision relates only to mitigation of property damage and not to a lifesafety concern, the proposal shall be reviewed based on its measurable benefits in relation to the costs imposed.

    (b)

    Develop and adopt within the Florida Building Code a means to incorporate recognized mitigation techniques for site-built, single-family residential structures constructed before the implementation of the Florida Building Code, including, but not limited to:

    1.

    Prescriptive techniques for the installation of gable-end bracing;

    2.

    Secondary water barriers for roofs and standards relating to secondary water barriers. The criteria may include, but need not be limited to, roof shape, slope, and composition of all elements of the roof system. The criteria may not be limited to one method or material for a secondary water barrier;

    3.

    Prescriptive techniques for improvement of roof-to-wall connections. The Legislature recognizes that the cost of retrofitting existing buildings to meet the code requirements for new construction in this regard may exceed the practical benefit to be attained. The Legislature intends for the commission to provide for the integration of alternate, lower-cost means that may be employed to retrofit existing buildings that are not otherwise required to comply with the requirements of the Florida Building Code for new construction so that the cost of such improvements does not exceed approximately 15 percent of the cost of reroofing. Roof-to-wall connections shall not be required unless evaluation and installation of connections at gable ends or all corners can be completed for 15 percent of the cost of roof replacement. For houses that have both hip and gable roof ends, the priority shall be to retrofit the gable end roof-to-wall connections unless the width of the hip is more than 1.5 times greater than the width of the gable end. Priority shall be given to connecting the corners of roofs to walls below the locations at which the spans of the roofing members are greatest;

    4.

    Strengthening or correcting roof-decking attachments and fasteners during reroofing; and

    5.

    Adding or strengthening opening protections.

    (3)

    The Legislature finds that the integration of these specifically identified mitigation measures is critical to addressing the serious problem facing the state from damage caused by windstorms and that delay in the adoption and implementation constitutes a threat to the health, safety, and welfare of the state. Accordingly, the Florida Building Commission shall develop and adopt these measures by October 1, 2007, by rule separate from the Florida Building Code, which take immediate effect and shall incorporate such requirements into the next edition of the Florida Building Code. Such rules shall require or otherwise clarify that for site-built, single-family residential structures:

    (a)

    A roof replacement must incorporate the techniques specified in subparagraphs (2)(b)2. and 4.

    (b)

    For a building that is located in the wind-borne debris region as defined in s. 1609.2 of the International Building Code (2006) and that has an insured value of $300,000 or more or, if the building is uninsured or for which documentation of insured value is not presented, has a just valuation for the structure for purposes of ad valorem taxation of $300,000 or more, a roof replacement must incorporate the techniques specified in subparagraph (2)(b)3.

    (c)

    Any activity requiring a building permit, not including roof covering replacement or repair work associated with the prevention of degradation of the residence, that is applied for on or after July 1, 2008, and for which the estimated cost is $50,000 or more, must include provision of opening protections as required within the Florida Building Code for new construction for a building that is located in the wind-borne debris region as defined in s. 1609.2 of the International Building Code (2006) and that has an insured value of $750,000 or more, or, if the building is uninsured or for which documentation of insured value is not presented, has a just valuation for the structure for purposes of ad valorem taxation of $750,000 or more.

    (4)

    Notwithstanding the provisions of this section, exposed mechanical equipment or appliances fastened to a roof or installed on the ground in compliance with the code using rated stands, platforms, curbs, slabs, walls, or other means are deemed to comply with the wind resistance requirements of the 2007 Florida Building Code, as amended. Further support or enclosure of such mechanical equipment or appliances is not required by a state or local official having authority to enforce the Florida Building Code.

    (5)

    Notwithstanding any provision in the Florida Building Code to the contrary, if an existing roofing system or roof section was built, repaired, or replaced in compliance with the requirements of the 2007 Florida Building Code, or any subsequent editions of the Florida Building Code, and 25 percent or more of such roofing system or roof section is being repaired, replaced, or recovered, only the repaired, replaced, or recovered portion is required to be constructed in accordance with the Florida Building Code in effect, as applicable. The Florida Building Commission shall adopt this exception by rule and incorporate it in the Florida Building Code. Notwithstanding s. 553.73(4), a local government may not adopt by ordinance an administrative or technical amendment to this exception.

    History.

    —

    s. 5, ch. 2007-126; s. 17, ch. 2008-191; s. 40, ch. 2010-176; s. 16, ch. 2012-13; s. 10, ch. 2016-11; s. 23, ch. 2016-129; s. 1, ch. 2022-269.

    source ↗
  • Fla. Stat. § 553.842 Product evaluation and approval

    553.842

    Product evaluation and approval.

    —

    (1)

    The commission shall adopt rules under ss. 120.536(1) and 120.54 to develop and implement a product evaluation and approval system that applies statewide to operate in coordination with the Florida Building Code. The commission may enter into contracts to provide for administration of the product evaluation and approval system. The commission’s rules and any applicable contract may provide that the payment of fees related to approvals be made directly to the administrator. Any fee paid by a product manufacturer shall be used only for funding the product evaluation and approval system. The product evaluation and approval system shall provide:

    (a)

    Appropriate promotion of innovation and new technologies.

    (b)

    Processing submittals of products from manufacturers in a timely manner.

    (c)

    Independent, third-party qualified and accredited testing and laboratory facilities, product evaluation entities, quality assurance agencies, certification agencies, and validation entities.

    (d)

    An easily accessible product acceptance list to entities subject to the Florida Building Code.

    (e)

    Development of stringent but reasonable testing criteria based upon existing consensus standards, when available, for products.

    (f)

    Long-term approvals, where feasible. State and local approvals will be valid until the requirements of the code on which the approval is based change, the product changes in a manner affecting its performance as required by the code, or the approval is revoked. However, the commission may authorize by rule editorial revisions to approvals and charge a fee as provided in this section.

    (g)

    Criteria for revocation of a product approval.

    (h)

    Cost-effectiveness.

    (2)

    The product evaluation and approval system shall rely on national and international consensus standards, whenever adopted by the Florida Building Code, for demonstrating compliance with code standards. Other standards which meet or exceed established state requirements shall also be considered.

    (3)

    Products or methods or systems of construction that require approval under s. 553.77, that have standardized testing or comparative or rational analysis methods established by the code, and that are certified by an approved product evaluation entity, testing laboratory, or certification agency as complying with the standards specified by the code shall be approved for statewide use. Products required to be approved for statewide use shall be approved by one of the methods established in subsection (5) without further evaluation.

    (4)

    Products or methods or systems of construction requiring approval under s. 553.77 must be approved by one of the methods established in subsection (5) before their use in construction in this state. Products may be approved by the commission for statewide use. Notwithstanding a local government’s authority to amend the Florida Building Code as provided in this act, statewide approval shall preclude local jurisdictions from requiring further testing, evaluation, or submission of other evidence as a condition of using the product so long as the product is being used consistent with the conditions of its approval.

    (5)

    Statewide approval of products, methods, or systems of construction may be achieved by one of the following methods. One of these methods must be used by the commission to approve the following categories of products: panel walls, exterior doors, roofing, skylights, windows, shutters, impact protective systems, and structural components as established by the commission by rule. A product may not be advertised, sold, offered, provided, distributed, or marketed as hurricane, windstorm, or impact protection from wind-borne debris from a hurricane or windstorm unless it is approved pursuant to this section or s. 553.8425. Any person who advertises, sells, offers, provides, distributes, or markets a product as hurricane, windstorm, or impact protection from wind-borne debris without such approval is subject to the Florida Deceptive and Unfair Trade Practices Act under part II of chapter 501 brought by the enforcing authority as defined in s. 501.203.

    (a)

    Products for which the code establishes standardized testing or comparative or rational analysis methods shall be approved by submittal and validation of one of the following reports or listings indicating that the product or method or system of construction was in compliance with the Florida Building Code and that the product or method or system of construction is, for the purpose intended, at least equivalent to that required by the Florida Building Code:

    1.

    A certification mark or listing of an approved certification agency, which may be used only for products for which the code designates standardized testing;

    2.

    A test report from an approved testing laboratory;

    3.

    A product evaluation report based upon testing or comparative or rational analysis, or a combination thereof, from an approved product evaluation entity; or

    4.

    A product evaluation report based upon testing or comparative or rational analysis, or a combination thereof, developed and signed and sealed by a professional engineer or architect, licensed in this state.

    A product evaluation report or a certification mark or listing of an approved certification agency which demonstrates that the product or method or system of construction complies with the Florida Building Code for the purpose intended is equivalent to a test report and test procedure referenced in the Florida Building Code. An application for state approval of a product under subparagraph 1. or subparagraph 3. must be approved by the department after the commission staff or a designee verifies that the application and related documentation are complete. This verification must be completed within 10 business days after receipt of the application. Upon approval by the department, the product shall be immediately added to the list of state-approved products maintained under subsection (13). Approvals by the department shall be reviewed and ratified by the commission’s program oversight committee except for a showing of good cause that a review by the full commission is necessary. The commission shall adopt rules providing means to cure deficiencies identified within submittals for products approved under this paragraph.

    (b)

    Products, methods, or systems of construction for which there are no specific standardized testing or comparative or rational analysis methods established in the code may be approved by submittal and validation of one of the following:

    1.

    A product evaluation report based upon testing or comparative or rational analysis, or a combination thereof, from an approved product evaluation entity indicating that the product or method or system of construction was in compliance with the intent of the Florida Building Code and that the product or method or system of construction is, for the purpose intended, at least equivalent to that required by the Florida Building Code; or

    2.

    A product evaluation report based upon testing or comparative or rational analysis, or a combination thereof, developed and signed and sealed by a professional engineer or architect, licensed in this state, who certifies that the product or method or system of construction is, for the purpose intended, at least equivalent to that required by the Florida Building Code.

    (6)

    The commission shall ensure that product manufacturers that obtain statewide product approval operate quality assurance programs for all approved products. The commission shall adopt by rule criteria for operation of the quality assurance programs.

    (7)

    For state approvals, validation shall be performed by validation entities approved by the commission. The commission shall adopt by rule criteria for approval of validation entities, which shall be third-party entities independent of the product’s manufacturer and which shall certify to the commission the product’s compliance with the code. The commission may adopt by rule a schedule of penalties to be imposed against approved validation entities that validate product applications in violation of this section or rules adopted under this section.

    (8)

    The commission may adopt rules to approve the following types of entities that produce information on which product approvals are based. All of the following entities, including engineers and architects, must comply with a nationally recognized standard demonstrating independence or no conflict of interest:

    (a)

    Evaluation entities approved under this paragraph or that meet the criteria for approval adopted by the commission by rule. The commission shall specifically approve the National Evaluation Service, the International Association of Plumbing and Mechanical Officials Evaluation Service, the International Code Council Evaluation Services, Underwriters Laboratories, LLC, Intertek Testing Services NA, Inc., and the Miami-Dade County Building Code Compliance Office Product Control Division. Architects and engineers licensed in this state are also approved to conduct product evaluations as provided in subsection (5).

    (b)

    Testing laboratories accredited by national organizations, such as A2LA and the National Voluntary Laboratory Accreditation Program, laboratories accredited by evaluation entities approved under paragraph (a), and laboratories that comply with other guidelines for testing laboratories selected by the commission and adopted by rule.

    (c)

    Quality assurance entities approved by evaluation entities approved under paragraph (a) and by certification agencies approved under paragraph (d) and other quality assurance entities that comply with guidelines selected by the commission and adopted by rule.

    (d)

    Certification agencies accredited by nationally recognized accreditors and other certification agencies that comply with guidelines selected by the commission and adopted by rule.

    (e)

    Validation entities that comply with accreditation standards established by the commission by rule.

    (9)

    A building official may deny the local application of a product or method or system of construction which has received statewide approval, based upon a written report signed by the official that concludes the product application is inconsistent with the statewide approval and that states the reasons the application is inconsistent. Such denial is subject to the provisions of s. 553.77 governing appeal of the building official’s interpretation of the code.

    (10)

    Products, other than manufactured buildings, which are custom fabricated or assembled shall not require separate approval under this section provided the component parts have been approved for the fabricated or assembled product’s use and the components meet the standards and requirements of the Florida Building Code which applies to the product’s intended use.

    (11)

    A building official may appeal the required approval for local use of a product or method or system of construction to the commission. The commission shall conduct a hearing under chapter 120 and the uniform rules of procedure and shall handle such appeals in an expedited manner.

    (12)

    The decisions of local building officials shall be appealable to the local board of appeals, if such board exists, and then to the commission, which shall conduct a hearing under chapter 120 and the uniform rules of procedure. Decisions of the commission regarding statewide product approvals and appeals of local product approval shall be subject to judicial review pursuant to s. 120.68.

    (13)

    The commission shall maintain a list of the state-approved products, product evaluation entities, testing laboratories, quality assurance agencies, certification agencies, and validation entities and make such lists available in the most cost-effective manner. The commission shall establish reasonable timeframes associated with the product approval process and availability of the lists.

    (14)

    The commission shall by rule establish criteria for revocation of product approvals as well as suspension of approvals of product evaluation entities, including those approved in accordance with paragraph (8)(a), and suspension or revocation of approvals of testing laboratories, quality assurance entities, certification agencies, and validation entities. Suspension and revocation is governed by s. 120.60 and the uniform rules of procedure.

    (15)

    The commission may adopt a rule listing the prescriptive, material standards and alternative means by which products subject to those standards may demonstrate compliance with the code.

    (16)

    The commission may adopt a rule that identifies standards that are equivalent to or more stringent than those specifically adopted by the code, thereby allowing the use in this state of the products that comply with the equivalent standard.

    History.

    —

    s. 54, ch. 98-287; s. 90, ch. 2000-141; s. 30, ch. 2001-186; s. 18, ch. 2002-293; s. 16, ch. 2005-147; s. 65, ch. 2006-1; s. 8, ch. 2007-187; s. 16, ch. 2008-191; s. 39, ch. 2010-176; s. 32, ch. 2011-222; s. 17, ch. 2013-193; s. 22, ch. 2016-129; s. 6, ch. 2021-201.

    source ↗
  • Fla. Stat. § 553.7922 Local government-expedited approval of certain permits

    553.7922

    Local government-expedited approval of certain permits.

    —

    Following a state of emergency declared pursuant to s. 252.36 for a natural emergency, local governments impacted by the emergency shall approve special processing procedures to expedite permit issuance for permits that do not require technical review, including, but not limited to, roof repairs, reroofing, electrical repairs, service changes, or the replacement of one window or one door. Local governments may waive application and inspection fees for permits expedited under this section.

    History.

    —

    s. 12, ch. 2023-304.

    source ↗
  • Fla. Stat. § 553.792 Building permit application to local government

    553.792

    Building permit application to local government.

    —

    (1)(a)

    A local government must approve, approve with conditions, or deny a building permit application after receipt of a completed and sufficient application within the following timeframes, unless the applicant waives such timeframes in writing:

    1.

    Within 30 business days after receiving a complete and sufficient application, for an applicant using a local government plans reviewer to obtain the following building permits if the structure is less than 7,500 square feet: residential units, including a single-family residential unit or a single-family residential dwelling, accessory structure, alarm, electrical, irrigation, landscaping, mechanical, plumbing, or roofing.

    2.

    Within 60 business days after receiving a complete and sufficient application, for an applicant using a local government plans reviewer to obtain the following building permits if the structure is 7,500 square feet or more: residential units, including a single-family residential unit or a single-family residential dwelling, accessory structure, alarm, electrical, irrigation, landscaping, mechanical, plumbing, or roofing.

    3.

    Within 60 business days after receiving a complete and sufficient application, for an applicant using a local government plans reviewer to obtain the following building permits: signs or nonresidential buildings that are less than 25,000 square feet.

    4.

    Within 60 business days after receiving a complete and sufficient application, for an applicant using a local government plans reviewer to obtain the following building permits: multifamily residential, not exceeding 50 units; site-plan approvals and subdivision plats not requiring public hearing or public notice; and lot grading and site alteration.

    5.

    Within 12 business days after receiving a complete and sufficient application, for an applicant using a master building permit consistent with s. 553.794 to obtain a site-specific building permit.

    6.

    Within 10 business days after receiving a complete and sufficient application, for an applicant for a single-family residential dwelling applied for by a contractor licensed in this state on behalf of a property owner who participates in a Community Development Block Grant-Disaster Recovery program administered by the Department of Commerce, unless the permit application fails to satisfy the Florida Building Code or the enforcing agency’s laws or ordinances.

    However, the local government may not require the waiver of the timeframes in this section as a condition precedent to reviewing an applicant’s building permit application.

    (b)

    A local government must meet the timeframes set forth in this section for reviewing building permit applications unless the timeframes set by local ordinance are more stringent than those prescribed in this section.

    1

    (c)

    After an applicant submits an application to the local government, the local government must provide written notice to the applicant within 5 business days after receipt of the application advising the applicant what information, if any, is needed to deem or determine that the application is properly completed in compliance with the filing requirements published by the local government. If the local government does not provide timely written notice that the applicant has not submitted the properly completed application, the application is automatically deemed or determined to be properly completed and accepted.

    1

    (d)

    A local government shall maintain on its website a policy containing procedures and expectations for expedited processing of those building permits and development orders required by law to be expedited.

    (e)

    If a local government fails to meet a deadline under this subsection, it must reduce the building permit fee by 10 percent for each business day that it fails to meet the deadline, unless the parties agree in writing to a reasonable extension of time, the delay is caused by the applicant, or the delay is attributable to a force majeure or other extraordinary circumstances. Each 10-percent reduction shall be based on the original amount of the building permit fee, unless the parties agree to an extension of time.

    (f)

    A local enforcement agency does not have to reduce the building permit fee if it provides written notice to the applicant by e-mail or United States Postal Service within the respective timeframes in paragraph (a) which specifically states the reasons the permit application fails to satisfy the Florida Building Code or the enforcing agency’s laws or ordinances. The written notice must also state that the applicant has 10 business days after receiving the written notice to submit revisions to correct the permit application and that failure to correct the application within 10 business days will result in a denial of the application.

    (g)

    If the applicant submits revisions within 10 business days after receiving the written notice, the local enforcement agency has 10 business days after receiving such revisions to approve or deny the building permit unless the applicant agrees to a longer period in writing. If the local enforcement agency fails to issue or deny the building permit within 10 business days after receiving the revisions, it must reduce the building permit fee by 20 percent for each business day that it fails to meet the deadline unless the applicant agrees to a longer period in writing.

    (2)

    If any building permit fees are refunded under this section, the surcharges provided in s. 468.631 or s. 553.721 must be recalculated based on the amount of the building permit fees after the refund.

    History.

    —

    s. 35, ch. 2005-147; s. 63, ch. 2006-1; s. 5, ch. 2021-224; s. 5, ch. 2022-136; s. 38, ch. 2023-17; s. 5, ch. 2024-191.

    1

    Note.

    —

    Section 43, ch. 2023-17, provides:

    “(1) The Department of Revenue is authorized, and all conditions are deemed met, to adopt emergency rules under s. 120.54(4), Florida Statutes, for the purpose of implementing provisions related to the Live Local Program created by this act. Notwithstanding any other law, emergency rules adopted under this section are effective for 6 months after adoption and may be renewed during the pendency of procedures to adopt permanent rules addressing the subject of the emergency rules.

    “(2) This section expires July 1, 2026.”

    source ↗
  • Fla. Stat. § 553.791 Alternative plans review and inspection

    553.791

    Alternative plans review and inspection.

    —

    (1)

    As used in this section, the term:

    (a)

    “Applicable codes” means the Florida Building Code and any local technical amendments to the Florida Building Code but does not include the applicable minimum fire prevention and firesafety codes adopted pursuant to chapter 633.

    (b)

    “Audit” means the process to confirm that the building code inspection services have been performed by the private provider, including ensuring that the required affidavit for the plan review has been properly completed and submitted with the permit documents and that the minimum mandatory inspections required under the building code have been performed and properly recorded. The local building official may not replicate the plan review or inspection being performed by the private provider, unless expressly authorized by this section.

    (c)

    “Building” means any construction, erection, alteration, demolition, or improvement of, or addition to, any structure or site work for which permitting by a local enforcement agency is required.

    (d)

    “Building code inspection services” means those services described in s. 468.603(5) and (8) involving the review of building plans as well as those services involving the review of site plans and site work engineering plans or their functional equivalent, to determine compliance with applicable codes and those inspections required by law, conducted either in person or virtually, of each phase of construction for which permitting by a local enforcement agency is required to determine compliance with applicable codes.

    (e)

    “Deliver” or “delivery” means any method of delivery used in conventional business or commercial practice, including delivery by electronic transmissions.

    (f)

    “Duly authorized representative” means an agent of the private provider identified in the permit application who reviews plans or performs inspections as provided by this section and who is licensed as an engineer under chapter 471 or as an architect under chapter 481 or who holds a standard or provisional certificate under part XII of chapter 468. A duly authorized representative who only holds a provisional certificate under part XII of chapter 468 must be under the direct supervision of a person licensed as a building code administrator under part XII of chapter 468.

    (g)

    “Electronic signature” means any letters, characters, or symbols manifested by electronic or similar means which are executed or adopted by a party with an intent to authenticate a writing or record.

    (h)

    “Electronic transmission” or “submitted electronically” means any form or process of communication not directly involving the physical transfer of paper or another tangible medium which is suitable for the retention, retrieval, and reproduction of information by the recipient and is retrievable in paper form by the receipt through an automated process. All notices provided for in this section may be transmitted electronically and shall have the same legal effect as if physically posted or mailed.

    (i)

    “Electronically posted” means providing notices of decisions, results, or records, including inspection records, through the use of a website or other form of electronic communication used to transmit or display information.

    (j)

    “Immediate threat to public safety and welfare” means a building code violation that, if allowed to persist, constitutes an immediate hazard that could result in death, serious bodily injury, or significant property damage. This paragraph does not limit the authority of the local building official to issue a Notice of Corrective Action at any time during the construction of a building project or any portion of such project if the official determines that a condition of the building or portion thereof may constitute a hazard when the building is put into use following completion as long as the condition cited is shown to be in violation of the building code or approved plans.

    (k)

    “Local building official” means the individual within the governing jurisdiction responsible for direct regulatory administration or supervision of plans review, enforcement, and inspection of any construction, erection, alteration, demolition, or substantial improvement of, or addition to, any structure for which permitting is required to indicate compliance with applicable codes and includes any duly authorized designee of such person.

    (l)

    “Permit application” means a properly completed and submitted application for the requested building or construction permit, including:

    1.

    The plans reviewed by the private provider, or in the case of a single-trade plans review where a private provider uses an automated or software-based plans review system pursuant to subsection (6), the information reviewed by the automated or software-based plans review system to determine compliance with one or more applicable codes.

    2.

    The affidavit from the private provider required under subsection (6).

    3.

    Any applicable fees.

    4.

    Any documents required by the local building official to determine that the fee owner has secured all other government approvals required by law.

    (m)

    “Plans” means building plans, site engineering plans, or site plans, or their functional equivalent, submitted by a fee owner or fee owner’s contractor to a private provider or duly authorized representative for review.

    (n)

    “Private provider” means a person licensed as a building code administrator under part XII of chapter 468, as an engineer under chapter 471, or as an architect under chapter 481. For purposes of performing inspections under this section for additions and alterations that are limited to 1,000 square feet or less to residential buildings, the term “private provider” also includes a person who holds a standard certificate under part XII of chapter 468.

    (o)

    “Private provider firm” means a business organization, including a corporation, partnership, business trust, or other legal entity, which offers services under this chapter to the public through licensees who are acting as agents, employees, officers, or partners of the firm. A person who is licensed as a building code administrator under part XII of chapter 468, an engineer under chapter 471, or an architect under chapter 481 may act as a private provider for an agent, employee, or officer of the private provider firm.

    (p)

    “Request for certificate of occupancy or certificate of completion” means a properly completed and executed application for:

    1.

    A certificate of occupancy or certificate of completion.

    2.

    A certificate of compliance from the private provider required under subsection (13).

    3.

    Any applicable fees.

    4.

    Any documents required by the local building official to determine that the fee owner has secured all other government approvals required by law.

    (q)

    “Single-trade inspection” or “single-trade plans review” means any inspection or plans review focused on a single construction trade, such as plumbing, mechanical, or electrical. The term includes, but is not limited to, inspections or plans reviews of door or window replacements; fences and block walls more than 6 feet high from the top of the wall to the bottom of the footing; stucco or plastering; reroofing with no structural alteration; solar energy and energy storage installations or alterations; HVAC replacements; ductwork or fan replacements; alteration or installation of wiring, lighting, and service panels; water heater changeouts; sink replacements; and repiping.

    (r)

    “Site work” means the portion of a construction project that is not part of the building structure, including, but not limited to, grading, excavation, landscape irrigation, and installation of driveways.

    (s)

    “Stop-work order” means the issuance of any written statement, written directive, or written order which states the reason for the order and the conditions under which the cited work will be permitted to resume.

    (2)(a)

    Notwithstanding any other law or local government ordinance or local policy, the fee owner of a building or structure, or the fee owner’s contractor upon written authorization from the fee owner, may choose to use a private provider to provide building code inspection services with regard to such building or structure and may make payment directly to the private provider for the provision of such services. All such services shall be the subject of a written contract between the private provider, or the private provider’s firm, and the fee owner or the fee owner’s contractor, upon written authorization of the fee owner. The fee owner may elect to use a private provider to provide plans review or required building inspections, or both. However, if the fee owner or the fee owner’s contractor uses a private provider to provide plans review, the local building official, in his or her discretion and pursuant to duly adopted policies of the local enforcement agency, may require the fee owner or the fee owner’s contractor to use a private provider to also provide required building inspections.

    (b)

    If an owner or contractor retains a private provider for purposes of plans review or building inspection services, the local jurisdiction must reduce the permit fee by the amount of cost savings realized by the local enforcement agency for not having to perform such services. Such reduction may be calculated on a flat fee or percentage basis, or any other reasonable means by which a local enforcement agency assesses the cost for its plans review or inspection services. The local jurisdiction may not charge fees for building inspections if the fee owner or contractor hires a private provider to perform such services; however, the local jurisdiction may charge a reasonable administrative fee, which shall be based on the cost that is actually incurred, including the labor cost of the personnel providing the service, by the local jurisdiction or attributable to the local jurisdiction for the clerical and supervisory assistance required, or both.

    (c)

    If an owner or a contractor retains a private provider for purposes of plans review or building inspection services, the local jurisdiction must provide equal access to all permitting and inspection documents and reports to the private provider, owner, and contractor if such access is provided by software that protects exempt records from disclosure.

    (3)

    A private provider and any duly authorized representative may only perform building code inspection services that are within the disciplines covered by that person’s licensure or certification under chapter 468, chapter 471, or chapter 481, including single-trade inspections. A private provider may not provide building code inspection services pursuant to this section upon any building designed or constructed by the private provider or the private provider’s firm.

    (4)

    A fee owner or the fee owner’s contractor using a private provider to provide building code inspection services shall notify the local building official in writing at the time of permit application, or by 2 p.m. local time, 2 business days before the first scheduled inspection by the local building official or building code enforcement agency that a private provider has been contracted to perform the required inspections of construction under this section, including single-trade inspections, on a form to be adopted by the commission. This notice shall include the following information:

    (a)

    The services to be performed by the private provider.

    (b)

    The name, firm, address, telephone number, and e-mail address of each private provider who is performing or will perform such services, his or her professional license or certification number, qualification statements or resumes, and, if required by the local building official, a certificate of insurance demonstrating that professional liability insurance coverage is in place for the private provider’s firm, the private provider, and any duly authorized representative in the amounts required by this section.

    (c)

    An acknowledgment from the fee owner or the fee owner’s contractor in substantially the following form:

    I have elected to use one or more private providers to provide building code plans review and/or inspection services on the building or structure that is the subject of the enclosed permit application, as authorized by s. 553.791, Florida Statutes. I understand that the local building official may not review the plans submitted or perform the required building inspections to determine compliance with the applicable codes, except to the extent specified in said law. Instead, plans review and/or required building inspections will be performed by licensed or certified personnel identified in the application. The law requires minimum insurance requirements for such personnel, but I understand that I may require more insurance to protect my interests. By executing this form, I acknowledge that I have made inquiry regarding the competence of the licensed or certified personnel and the level of their insurance and am satisfied that my interests are adequately protected. I agree to indemnify, defend, and hold harmless the local government, the local building official, and their building code enforcement personnel from any and all claims arising from my use of these licensed or certified personnel to perform building code inspection services with respect to the building or structure that is the subject of the enclosed permit application.

    If the fee owner or the fee owner’s contractor makes any changes to the listed private providers or the services to be provided by those private providers, the fee owner or the fee owner’s contractor shall, within 1 business day after any change or within 2 business days before the next scheduled inspection, update the notice to reflect such changes. A change of a duly authorized representative named in the permit application does not require a revision of the permit, and the building code enforcement agency shall not charge a fee for making the change.

    (5)

    After construction has commenced and if either the local building official is unable to provide inspection services in a timely manner or the work subject to inspection is related to a single-trade inspection for a single-family or two-family dwelling, the fee owner or the fee owner’s contractor may elect to use a private provider to provide inspection services by notifying the local building official of the owner’s or contractor’s intention to do so by 2 p.m. local time, 2 business days before the next scheduled inspection using the notice provided for in paragraphs (4)(a)-(c).

    (6)

    A private provider performing plans review under this section shall review the plans to determine compliance with the applicable codes. For single-trade plans reviews, a private provider may use an automated or software-based plans review system designed to determine compliance with one or more applicable codes, including, but not limited to, the National Electrical Code and the Florida Building Code. Upon determining that the plans reviewed comply with the applicable codes, the private provider shall prepare an affidavit or affidavits certifying, under oath, that the following is true and correct to the best of the private provider’s knowledge and belief:

    (a)

    The plans were reviewed by the affiant, who is duly authorized to perform plans review pursuant to this section and holds the appropriate license or certificate.

    (b)

    The plans comply with the applicable codes.

    Such affidavit may bear a written or electronic signature and may be submitted electronically to the local building official.

    (7)(a)

    No more than 20 business days, or if the permit application is related to a single-trade plans review for a single-family or two-family dwelling, no more than 5 business days, after receipt of a permit application and the affidavit from the private provider required pursuant to subsection (6), the local building official shall issue the requested permit or provide a written notice to the permit applicant identifying the specific plan features that do not comply with the applicable codes, as well as the specific code chapters and sections. If the local building official does not provide a written notice of the plan deficiencies within the prescribed time period, the permit application must be deemed approved as a matter of law, and the permit must be issued by the local building official on the next business day.

    (b)

    If the local building official provides a written notice of plan deficiencies to the permit applicant within the prescribed time period, the time period is tolled pending resolution of the matter. To resolve the plan deficiencies, the permit applicant may elect to dispute the deficiencies pursuant to subsection (15) or to submit revisions to correct the deficiencies.

    (c)

    If the permit applicant submits revisions, the local building official has the remainder of the tolled time period plus 5 business days after the date of resubmittal to issue the requested permit or to provide a second written notice to the permit applicant stating which of the previously identified plan features remain in noncompliance with the applicable codes, with specific reference to the relevant code chapters and sections. Any subsequent review by the local building official is limited to the deficiencies cited in the written notice. If the local building official does not provide the second written notice within the prescribed time period, the permit must be deemed approved as a matter of law, and the local building official must issue the permit on the next business day.

    (d)

    If the local building official provides a second written notice of plan deficiencies to the permit applicant within the prescribed time period, the permit applicant may elect to dispute the deficiencies pursuant to subsection (15) or to submit additional revisions to correct the deficiencies. For all revisions submitted after the first revision, the local building official has an additional 5 business days after the date of resubmittal to issue the requested permit or to provide a written notice to the permit applicant stating which of the previously identified plan features remain in noncompliance with the applicable codes, with specific reference to the relevant code chapters and sections.

    (8)

    A private provider performing required inspections under this section shall inspect each phase of construction as required by the applicable codes. Such inspection, including a single-trade inspection, may be performed in person or virtually. The private provider may have a duly authorized representative perform the required inspections, provided all required reports are prepared by and bear the written or electronic signature of the private provider or the private provider’s duly authorized representative. The duly authorized representative must be an employee of the private provider entitled to receive reemployment assistance benefits under chapter 443. The contractor’s contractual or legal obligations are not relieved by any action of the private provider.

    (9)

    A private provider performing required inspections under this section shall provide notice to the local building official of the approximate date and time of any such inspection. The local building official may not prohibit the private provider from performing any inspection outside the local building official’s normal operating hours, including after hours, weekends, or holidays. The local building official may visit the building site as often as necessary to verify that the private provider is performing all required inspections. A deficiency notice must be posted by the private provider, the duly authorized representative of the private provider, or the building department whenever a noncomplying item related to the building code or the permitted documents is found. Such notice may be physically posted at the job site or electronically posted. After corrections are made, the item must be reinspected by the private provider or representative before being concealed. Reinspection or reaudit fees shall not be charged by the local jurisdiction as a result of the local jurisdiction’s audit inspection occurring before the performance of the private provider’s inspection or for any other administrative matter not involving the detection of a violation of the building code or a permit requirement.

    (10)

    If the private provider is a person licensed as an engineer under chapter 471 or an architect under chapter 481 and affixes his or her professional seal to the affidavit required under subsection (6), the local building official must issue the requested permit or provide a written notice to the permit applicant identifying the specific plan features that do not comply with the applicable codes, as well as the specific code chapters and sections, within 10 business days after receipt of the permit application and affidavit. In such written notice, the local building official must provide with specificity the plan’s deficiencies, the reasons the permit application failed, and the applicable codes being violated. If the local building official does not provide specific written notice to the permit applicant within the prescribed 10-day period, the permit application is deemed approved as a matter of law, and the local building official must issue the permit on the next business day.

    (11)

    If equipment replacements and repairs must be performed in an emergency situation, subject to the emergency permitting provisions of the Florida Building Code, a private provider may perform emergency inspection services without first notifying the local building official pursuant to subsection (9). A private provider must conduct the inspection within 3 business days after being contacted to conduct an emergency inspection and must submit the inspection report to the local building official within 1 day after the inspection is completed.

    (12)

    Upon completing the required inspections at each applicable phase of construction, the private provider shall record such inspections on a form acceptable to the local building official. The form must bear the written or electronic signature of the provider or the provider’s duly authorized representative. These inspection records shall reflect those inspections required by the applicable codes of each phase of construction for which permitting by a local enforcement agency is required. The private provider, upon completion of the required inspection, shall post each completed inspection record, indicating pass or fail, and provide the record to the local building official within 2 business days. Such inspection record may be electronically posted by the private provider, or the private provider may post such inspection record physically at the project site. The private provider may electronically transmit the record to the local building official. The local building official may waive the requirement to provide a record of each inspection within 2 business days if the record is electronically posted or posted at the project site and all such inspection records are submitted with the certificate of compliance. Unless the records have been electronically posted, records of all required and completed inspections shall be maintained at the building site at all times and made available for review by the local building official. The private provider shall report to the local enforcement agency any condition that poses an immediate threat to public safety and welfare.

    (13)

    Upon completion of all required inspections, the private provider shall prepare a certificate of compliance, on a form acceptable to the local building official, summarizing the inspections performed and including a written representation, under oath, that the stated inspections have been performed and that, to the best of the private provider’s knowledge and belief, the building construction inspected complies with the approved plans and applicable codes. The statement required of the private provider shall be substantially in the following form and shall be signed and sealed by a private provider as established in subsection (1) or may be electronically transmitted to the local building official:

    To the best of my knowledge and belief, the building components and site improvements outlined herein and inspected under my authority have been completed in conformance with the approved plans and the applicable codes.

    (14)(a)

    No more than 10 business days, or if the permit is related to single-family or two-family dwellings then no more than 2 business days, after receipt of a request for a certificate of occupancy or certificate of completion and the applicant’s presentation of a certificate of compliance and approval of all other government approvals required by law, including the payment of all outstanding fees, the local building official shall issue the certificate of occupancy or certificate of completion or provide a notice to the applicant identifying the specific deficiencies, as well as the specific code chapters and sections.

    (b)

    If the local building official does not provide notice of the deficiencies within the applicable time periods under paragraph (a), the request for a certificate of occupancy or certificate of completion is automatically granted and deemed issued as of the next business day. The local building official must provide the applicant with the written certificate of occupancy or certificate of completion within 10 days after it is automatically granted and issued. To resolve any identified deficiencies, the applicant may elect to dispute the deficiencies pursuant to subsection (15) or to submit a corrected request for a certificate of occupancy or certificate of completion.

    (15)

    If the local building official determines that the building construction or plans do not comply with the applicable codes, the official may deny the permit or request for a certificate of occupancy or certificate of completion, as appropriate, or may issue a stop-work order for the project or any portion thereof as provided by law, if the official determines that the noncompliance poses an immediate threat to public safety and welfare, subject to the following:

    (a)

    The local building official shall be available to meet with the private provider within 2 business days to resolve any dispute after issuing a stop-work order or providing notice to the applicant denying a permit or request for a certificate of occupancy or certificate of completion.

    (b)

    If the local building official and private provider are unable to resolve the dispute, the matter shall be referred to the local enforcement agency’s board of appeals, if one exists, which shall consider the matter at its next scheduled meeting or sooner. Any decisions by the local enforcement agency’s board of appeals, or local building official if there is no board of appeals, may be appealed to the commission as provided by this chapter.

    (c)

    Notwithstanding any provision of this section, any decisions regarding the issuance of a building permit, certificate of occupancy, or certificate of completion may be reviewed by the local enforcement agency’s board of appeals, if one exists. Any decision by the local enforcement agency’s board of appeals, or local building official if there is no board of appeals, may be appealed to the commission as provided by this chapter, which shall consider the matter at the commission’s next scheduled meeting.

    (16)

    For the purposes of this section, any notice to be provided by the local building official shall be deemed to be provided to the person or entity when successfully transmitted to the e-mail address listed for that person or entity in the permit application or revised permit application, or, if no e-mail address is stated, when actually received by that person or entity.

    (17)(a)

    A local enforcement agency, local building official, or local government may not adopt or enforce any laws, rules, procedures, policies, qualifications, or standards more stringent than those prescribed by this section.

    (b)

    A local enforcement agency, local building official, or local government may establish, for private providers, private provider firms, and duly authorized representatives working within that jurisdiction, a system of registration to verify compliance with the licensure requirements of paragraph (1)(n) and the insurance requirements of subsection (18).

    (c)

    This section does not limit the authority of the local building official to issue a stop-work order for a building project or any portion of the project, as provided by law, if the official determines that a condition on the building site constitutes an immediate threat to public safety and welfare.

    (18)

    A private provider may perform building code inspection services on a building project under this section only if the private provider maintains insurance for professional liability covering all services performed as a private provider. Such insurance shall have minimum policy limits of $1 million per occurrence and $2 million in the aggregate for any project with a construction cost of $5 million or less and $2 million per occurrence and $4 million in the aggregate for any project with a construction cost of over $5 million. Nothing in this section limits the ability of a fee owner to require additional insurance or higher policy limits. For these purposes, the term “construction cost” means the total cost of building construction as stated in the building permit application. If the private provider chooses to secure claims-made coverage to fulfill this requirement, the private provider must also maintain coverage for a minimum of 5 years subsequent to the performance of building code inspection services. The insurance required under this subsection shall be written only by insurers authorized to do business in this state with a minimum A.M. Best’s rating of A. Before providing building code inspection services within a local building official’s jurisdiction, a private provider must provide to the local building official a certificate of insurance evidencing that the coverages required under this subsection are in force.

    (19)

    When performing building code inspection services, a private provider is subject to the disciplinary guidelines of the applicable professional board with jurisdiction over his or her license or certification under chapter 468, chapter 471, or chapter 481. All private providers shall be subject to the disciplinary guidelines of s. 468.621(1)(c)-(h). Any complaint processing, investigation, and discipline that arise out of a private provider’s performance of building code inspection services shall be conducted by the applicable professional board.

    (20)

    A local building code enforcement agency may not audit the performance of building code inspection services by private providers operating within the local jurisdiction until the agency has created standard operating private provider audit procedures for the agency’s internal inspection and review staff, which includes, at a minimum, the private provider audit purpose and scope, private provider audit criteria, an explanation of private provider audit processes and objections, and detailed findings of areas of noncompliance. Such private provider audit procedures must be publicly available online, and a printed version must be readily accessible in agency buildings. The private provider audit results of staff for the prior two quarters also must be publicly available. The agency’s audit processes must adhere to the agency’s posted standard operating audit procedures. The same private provider or private provider firm may not be audited more than four times in a year unless the local building official determines a condition of a building constitutes an immediate threat to public safety and welfare, which must be communicated in writing to the private provider or private provider firm. Work on a building or structure may proceed after inspection and approval by a private provider. The work may not be delayed for completion of an inspection audit by the local building code enforcement agency.

    (21)

    The local government, the local building official, and their building code enforcement personnel shall be immune from liability to any person or party for any action or inaction by a fee owner of a building, or by a private provider or its duly authorized representative, in connection with building code inspection services as authorized in this act.

    (22)

    Notwithstanding any other law, a county, a municipality, a school district, or an independent special district may use a private provider to provide building code inspection services for a public works project, an improvement, a building, or any other structure that is owned by the county, municipality, school district, or independent special district.

    History.

    —

    s. 17, ch. 2002-293; s. 106, ch. 2005-2; s. 11, ch. 2005-147; s. 1, ch. 2005-216; s. 6, ch. 2006-65; s. 6, ch. 2007-187; s. 141, ch. 2008-4; s. 77, ch. 2012-30; s. 7, ch. 2017-149; s. 12, ch. 2019-86; s. 14, ch. 2019-165; s. 132, ch. 2020-2; s. 20, ch. 2020-27; s. 4, ch. 2021-201; s. 50, ch. 2022-4; s. 4, ch. 2022-136; s. 4, ch. 2024-191; s. 8, ch. 2025-140.

    source ↗
  • Fla. Stat. § 553.74 Florida Building Commission

    553.74

    Florida Building Commission.

    —

    (1)

    The Florida Building Commission is created and located within the Department of Business and Professional Regulation for administrative purposes. Members are appointed by the Governor subject to confirmation by the Senate. The commission is composed of 19 members, consisting of the following members:

    (a)

    One architect licensed pursuant to chapter 481 with at least 5 years of experience in the design and construction of buildings designated for Group E or Group I occupancies by the Florida Building Code. The American Institute of Architects, Florida Section, is encouraged to recommend a list of candidates for consideration.

    (b)

    One structural engineer registered to practice in this state and actively engaged in the profession. The Florida Engineering Society is encouraged to recommend a list of candidates for consideration.

    (c)

    One air-conditioning contractor, mechanical contractor, or mechanical engineer certified to do business in this state and actively engaged in the profession. The Florida Air Conditioning Contractors Association, the Florida Refrigeration and Air Conditioning Contractors Association, the Mechanical Contractors Association of Florida, and the Florida Engineering Society are encouraged to recommend a list of candidates for consideration.

    (d)

    One electrical contractor or electrical engineer certified to do business in this state and actively engaged in the profession. The Florida Association of Electrical Contractors; the National Electrical Contractors Association, Florida Chapter; and the Florida Engineering Society are encouraged to recommend a list of candidates for consideration.

    (e)

    One certified general contractor or one certified building contractor certified to do business in this state and actively engaged in the profession. The Associated Builders and Contractors of Florida, the Florida Associated General Contractors Council, the Florida Home Builders Association, and the Union Contractors Association are encouraged to recommend a list of candidates for consideration.

    (f)

    One plumbing contractor licensed to do business in this state and actively engaged in the profession. The Florida Association of Plumbing, Heating, and Cooling Contractors is encouraged to recommend a list of candidates for consideration.

    (g)

    One roofing or sheet metal contractor certified to do business in this state and actively engaged in the profession. The Florida Roofing, Sheet Metal, and Air Conditioning Contractors Association and the Sheet Metal and Air Conditioning Contractors’ National Association are encouraged to recommend a list of candidates for consideration.

    (h)

    One certified residential contractor licensed to do business in this state and actively engaged in the profession. The Florida Home Builders Association is encouraged to recommend a list of candidates for consideration.

    (i)

    Three members who are municipal, county, or district codes enforcement officials, one of whom is also a fire official. The Building Officials Association of Florida and the Florida Fire Marshals and Inspectors Association are encouraged to recommend a list of candidates for consideration.

    (j)

    One member of a Florida-based organization of persons with disabilities or a nationally chartered organization of persons with disabilities with chapters in this state which complies with or is certified to be compliant with the requirements of the Americans with Disabilities Act of 1990, as amended.

    (k)

    One member of the manufactured buildings industry who is licensed to do business in this state and is actively engaged in the industry. The Florida Manufactured Housing Association is encouraged to recommend a list of candidates for consideration.

    (l)

    One member of the building products manufacturing industry who is authorized to do business in this state and is actively engaged in the industry. The Florida Building Material Association, the Florida Concrete and Products Association, and the Fenestration Manufacturers Association are encouraged to recommend a list of candidates for consideration.

    (m)

    One member who is a representative of the building owners and managers industry who is actively engaged in commercial building ownership or management. The Building Owners and Managers Association is encouraged to recommend a list of candidates for consideration.

    (n)

    One member who is a representative of the insurance industry. The Florida Insurance Council is encouraged to recommend a list of candidates for consideration.

    (o)

    One member who is a swimming pool contractor licensed to do business in this state and actively engaged in the profession. The Florida Swimming Pool Association and the United Pool and Spa Association are encouraged to recommend a list of candidates for consideration.

    (p)

    The Chief Resilience Officer or his or her designee.

    (q)

    One member who is a representative of a natural gas distribution system and who is actively engaged in the distribution of natural gas in this state. The Florida Natural Gas Association is encouraged to recommend a list of candidates for consideration.

    (2)

    All appointments shall be for terms of 4 years. Each person who is a member of the Board of Building Codes and Standards on the effective date of this act shall serve the remainder of their term as a member of the Florida Building Commission. Any member who shall, during his or her term, cease to meet the qualifications for original appointment, through ceasing to be a practicing member of the profession indicated or otherwise, shall thereby forfeit membership on the commission.

    (3)

    Members of the commission shall serve without compensation, but shall be entitled to reimbursement for per diem and travel expenses as provided by s. 112.061.

    (4)

    Each appointed member is accountable to the Governor for the proper performance of the duties of the office. The Governor shall cause to be investigated any complaint or unfavorable report received concerning an action of the commission or any member and shall take appropriate action thereon. The Governor may remove from office any appointed member for malfeasance, misfeasance, neglect of duty, incompetence, permanent inability to perform official duties, or pleading guilty or nolo contendere to, or being found guilty of, a felony.

    (5)

    Notwithstanding s. 112.313 or any other provision of law, a member of any of the commission’s technical advisory committees or a member of any other advisory committee or workgroup of the commission, does not have an impermissible conflict of interest when representing clients before the commission or one of its committees or workgroups. However, the member, in his or her capacity as member of the committee or workgroup, may not take part in any discussion on or take action on any matter in which he or she has a direct financial interest.

    History.

    —

    s. 5, ch. 74-167; s. 2, ch. 77-365; s. 4, ch. 78-323; ss. 1, 2, ch. 80-231; ss. 1, 3, 4, ch. 81-7; ss. 1, 4, ch. 82-46; s. 2, ch. 83-265; ss. 3, 5, 6, ch. 91-172; s. 5, ch. 91-429; s. 803, ch. 97-103; s. 41, ch. 98-287; s. 76, ch. 2000-141; s. 63, ch. 2000-154; s. 15, ch. 2002-293; ss. 664, 665, ch. 2003-261; s. 11, ch. 2008-191; s. 33, ch. 2010-176; s. 415, ch. 2011-142; s. 31, ch. 2011-222; s. 15, ch. 2013-193; s. 19, ch. 2014-154; s. 67, ch. 2016-10; s. 79, ch. 2020-160.

    source ↗

ANA Registered Roofing Providers in Miami

No ANA Registered contractors in this county yet for this trade.

Operate a roofing business in this area? You can be the first. The ANA Standards Pledge Program lists contractors who have pledged to follow the published Standards of Business on county-level reference pages across the network — sitting next to the actual laws of the jurisdiction we host here. $10/mo, no marketplace, no lead resale, no verification — pledge-based listing.

Take the pledge Learn how it works